Steer map and handoff to the live deploy and the fix list
Dungeon is live on Yggdrasil under Idunn v2 (454fc33); the operator ruled
"Stop here, we have shit to fix". Next action is PA.f211-f216 in order,
then the owed Soul pass; legacy-served and deploy-next text retired.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
parent
f23adbbf49
commit
eeb3a68042
2 changed files with 79 additions and 97 deletions
|
|
@ -103,14 +103,15 @@ is the witness. What is true of the tree now:
|
|||
`crates/ghostlight/src/controllers.rs`.
|
||||
- The Idunn provider side is complete: the runtime validates Expected and
|
||||
activation, publishes signed Warming until the write lease arrives, and
|
||||
exposes managed route presence. Production has not cut over.
|
||||
exposes managed route presence. Idunn v2 serves it on Yggdrasil since
|
||||
2026-09-23.
|
||||
- Plan steps 6 and 8 through 14 are landed with their follow-ups: the ten
|
||||
ontology passes, the seed producer, interruption, witness, and the Claude
|
||||
SDK inference port. `notes/ghostlight-implementation-plan.md` carries each
|
||||
step's landed state; the ontology doc carries the mechanism.
|
||||
|
||||
Do not start another world acceptance run while Yggdrasil still serves the
|
||||
legacy executable and state layout.
|
||||
World acceptance and scale runs stay gated by `state/map.yaml`
|
||||
`current_status.scale_checkpoint`.
|
||||
|
||||
## Immutable failure evidence
|
||||
|
||||
|
|
@ -130,16 +131,19 @@ measure only.
|
|||
|
||||
## Operational boundary
|
||||
|
||||
Yggdrasil still serves legacy Ghostlight release `a4080d4` from an enabled
|
||||
`Restart=always` unit with health v1, campaign/Session Zero state, and no
|
||||
`world.cc` or `app-sessions-v2.cc` witness. The Connector is also still on its
|
||||
legacy enabled body. CultNet through CultLib `85f7024` owns generation-bound
|
||||
Ghostlight Dungeon is live on Yggdrasil under Idunn v2 at
|
||||
`https://yggdrasil.gamecult.org/ghostlight/` (runtime `ghostlight-yggdrasil`,
|
||||
state root `/var/lib/gamecult/ghostlight-world-v2`); `/health` names the served
|
||||
commit. The legacy `ghostlight-dungeon.service` is stopped, its old state
|
||||
untouched; the v1 actuator, unit, wiring test and that state are retired in
|
||||
fact and owed deletion. The deploy and play session are recorded in the
|
||||
play-agent cut map block "The first deploy, 2026-09-23 (PA.f198-PA.f216)".
|
||||
CultNet through CultLib `85f7024` owns generation-bound
|
||||
activation, separate lifecycle brakes, process-write leases, observed
|
||||
capabilities, explicit disagreement, and routed RUDP incarnations. Odin through
|
||||
pushed `65cf2b2` owns deterministic recipe and binding admission, exact source
|
||||
freezing, sealed releases, durable deployment transactions, and the narrow
|
||||
native actuator ports. Current uncommitted Odin integration moves Idunn-owned
|
||||
projection and multi-session RUDP transport into those live paths.
|
||||
native actuator ports.
|
||||
|
||||
Ghostlight pushed `6a79cb0` with the provider side of this cut. Its recipe
|
||||
requests Idunn's runtime bundle, candidate bind, protected activation and
|
||||
|
|
@ -147,9 +151,8 @@ provider credentials, process-write-lease path, and admitted state-root
|
|||
binding. The runtime validates Expected and activation, publishes signed
|
||||
Warming, waits for the exact process lease before opening state, keeps that
|
||||
lease current through bind, Active publication, and serving, republishes Warming
|
||||
until the lease arrives, and exposes its managed route presence. CodexConnector
|
||||
pushed `ede3c30` with the corresponding stateless provider contract. Neither
|
||||
service has been admitted through rebuilt Idunn yet.
|
||||
until the lease arrives, and exposes its managed route presence. Idunn v2 admitted it
|
||||
on 2026-09-23.
|
||||
|
||||
The adopted cut puts a visible recipe with a constrained launch declaration in
|
||||
each target repo; raw unit or container-runtime templates are rejected. The
|
||||
|
|
@ -257,21 +260,16 @@ acceptance test `real_local_model_cognition_modes_commit_speech` in
|
|||
`POST /v1/chat/completions` to a loopback endpoint, no credential, inert
|
||||
tool calls. It opens only when `GHOSTLIGHT_LOCAL_ENDPOINT` is set
|
||||
(`runtime.rs`), and claims models by the `GHOSTLIGHT_LOCAL_MODEL_PREFIX`
|
||||
prefix, default `local/`. No model has been run behind it yet.
|
||||
prefix, default `local/`. Bonsai 2 is the live model behind it.
|
||||
- Topology (operator ruling 2026-09-23, "put each of the organs on the right
|
||||
machine"): the playtest's Dungeon runs on Yggdrasil beside Heimdall,
|
||||
deployed by Idunn through the `ghostlight` binding (Dungeon unit only) at
|
||||
ref `codex/ghostlight-dungeon-mvp`. Bonsai 2 stays on Raven's GPU and is
|
||||
reached at Yggdrasil loopback `127.0.0.1:18080` through a restricted-key
|
||||
reverse SSH tunnel over the WireGuard mesh, kept up by a Raven scheduled
|
||||
task. Local inference and Heimdall's private plane stay loopback-only.
|
||||
The Raven-hosted Dungeon (task `GhostlightDungeon`, `C:\Meta\ghostlight`,
|
||||
`deployment/raven/start-ghostlight-raven.ps1`) is a detour being retired.
|
||||
`gamecult-ops` owns the actuator, runbook and link; its
|
||||
`scripts/deploy-ghostlight-yggdrasil.sh` and
|
||||
`runbooks/ghostlight-dungeon-yggdrasil.md` are still bound to
|
||||
CodexConnector, and cutting that binding for the local link is the next
|
||||
action.
|
||||
machine"): Dungeon runs on Yggdrasil beside Heimdall under Idunn v2, binding
|
||||
`ghostlight` (Dungeon unit only), ref `codex/ghostlight-dungeon-mvp`.
|
||||
Bonsai 2 stays on Raven's GPU and reaches Yggdrasil loopback
|
||||
`127.0.0.1:18080` through Raven's `BonsaiLink` task. Local inference and
|
||||
Heimdall's private plane stay loopback-only. Heimdall is discovered through
|
||||
Odin at use, not an Idunn dependency, until it is a v2 target. The owner
|
||||
of deploy, link and verification is gamecult-ops
|
||||
`runbooks/ghostlight-dungeon-yggdrasil.md`.
|
||||
- CodexConnector is not an option for Dungeon inference (operator,
|
||||
2026-09-23). It is a deliberately isolated Codex fork so that Epiphany
|
||||
stops compiling Codex; nothing goes into it, and its `main` stays at
|
||||
|
|
@ -287,11 +285,11 @@ acceptance test `real_local_model_cognition_modes_commit_speech` in
|
|||
|
||||
### In order
|
||||
|
||||
1. The playtest gate below (operator order 2026-09-15; redirected to the
|
||||
play agent 2026-09-22).
|
||||
1. The fix list from the first play session (operator, 2026-09-23: "Stop
|
||||
here, we have shit to fix"): see "Playtest gate" below.
|
||||
2. The outbound half of the consumer contract: the response batch with a
|
||||
non-loopback CultMesh lease.
|
||||
3. The deployment gate below.
|
||||
3. Deleting the retired v1 deployment body (see "Deployment" below).
|
||||
4. Integration of the elaborator swarm's ideas (see "World fixtures and
|
||||
the elaborator swarm" below).
|
||||
|
||||
|
|
@ -314,9 +312,14 @@ table owns the turn lifecycle (Cut 8); the Eve play surface replaced
|
|||
`world.speak` (Cut 9); and the client round trip was exercised for the first
|
||||
time through a real lowering, which is where the answer path, the question
|
||||
token and the store migrations came from (Cuts 10 to 14). Soul's verdict after
|
||||
Cuts 12 and 13 is ready to play with one preflight. The unverified leg is
|
||||
seeding: `GHOSTLIGHT_SEED_VAULT_ROOT` has not been run end to end and appears
|
||||
in no runbook.
|
||||
Cuts 12 and 13 is ready to play with one preflight.
|
||||
|
||||
The first play session ran on Yggdrasil on 2026-09-23 and did not pass the
|
||||
gate. The fix list, in order, is PA.f212, PA.f211, PA.f213, PA.f214,
|
||||
PA.f215, PA.f216, then one Soul pass over Ghostlight `1fd52b7` onward plus
|
||||
Heimdall `e8e2832`, Odin `96a55ec` and Idunn `9ede4cd`. Each finding and its
|
||||
owner is in the cut map block "The first deploy, 2026-09-23
|
||||
(PA.f198-PA.f216)"; do not restate them here.
|
||||
|
||||
Operator rulings, 2026-09-22. One Dungeon-owned operational agent dispatches
|
||||
and interprets Persona turns, prompts the player, and negotiates results. It
|
||||
|
|
@ -400,31 +403,15 @@ merge. The retired first-generation loop under
|
|||
is deferred: workers emit imagegen-ready prompts only, and
|
||||
`scripts/generate_bfl_images.py` has no working default key path.
|
||||
|
||||
### Deployment gate
|
||||
### Deployment
|
||||
|
||||
Deferred behind the orders above, not cancelled:
|
||||
|
||||
Review and subtract the uncommitted Idunn-owned Expected/activation/anchor/lease
|
||||
projection and bounded multi-session RUDP document transport. Repoint Odin off
|
||||
its vendored CultNet fork onto CultLib `85f7024` as Ghostlight did, add UDP
|
||||
route actuation plus an independently persisted post-reload data-plane
|
||||
observation through the existing proxy, and verify that focused body on
|
||||
Yggdrasil. Then implement the directly managed Rust Odin that
|
||||
alone authenticates runtime observation into Present and derives Ready, plus
|
||||
exact capability dependency closure frozen inside the existing deployment
|
||||
transaction. Do not add another scheduler, registry, inbox, or shared-file
|
||||
correlation owner.
|
||||
|
||||
Install rebuilt Idunn and admit Odin first through the same
|
||||
Expected/Present/Ready contract, using its exact candidate only to bootstrap the
|
||||
evidence transport. Then admit Ghostlight Dungeon; CodexConnector is not its dependency. Same-generation
|
||||
continuity, route preservation, split-brain fencing, signed health, Odin-outage
|
||||
freeze, and negative legacy-authority checks must all agree before purge.
|
||||
|
||||
Deploy Ghostlight Dungeon through that contract. Runtime restart,
|
||||
route continuity, signed health, exact receipts, exclusive world-v3 state, and
|
||||
negative checks must agree before deleting old services, releases, state,
|
||||
acceptance roots, and local run scaffolding.
|
||||
Idunn v2 is the only deploy path (`idunn up ghostlight`, per gamecult-ops
|
||||
`runbooks/ghostlight-dungeon-yggdrasil.md`). Still owed on Ghostlight's side:
|
||||
deleting the retired v1 actuator, unit, wiring test and legacy
|
||||
`ghostlight-dungeon.service` state, and subtracting the library's
|
||||
CodexConnector transport. Idunn, Odin, CultLib and Heimdall follow-ups belong
|
||||
to those owners and are listed under "Open, other owners" in the cut map
|
||||
block "The first deploy, 2026-09-23 (PA.f198-PA.f216)".
|
||||
|
||||
## Essential references
|
||||
|
||||
|
|
@ -458,9 +445,9 @@ acceptance roots, and local run scaffolding.
|
|||
strict struct or fixture. Read the owner's published contract (pinned
|
||||
schema, owner-emitted samples) and prove each direction against the real
|
||||
counterpart. PA.f196 and PA.f197 in the play-agent cut map are the cost.
|
||||
- Do not invoke the current bounded Connector or Ghostlight redeploy helpers;
|
||||
they fail at the root/Idunn Git boundary and still embody duplicate target
|
||||
deployment authority.
|
||||
- Deploy only through Idunn v2. Do not invoke the retired v1 actuator
|
||||
(gamecult-ops `scripts/deploy-ghostlight-yggdrasil.sh`), its wiring test, or
|
||||
`ghostlight-dungeon.service`; they are owed deletion, not use.
|
||||
- Do not prove world-v3 purity with a short deny list. Archive the complete old
|
||||
state root or validate a complete allowed-path contract.
|
||||
- Keep this handoff compact. Move chronology to Git, evidence, or the frozen
|
||||
|
|
|
|||
Loading…
Reference in a new issue