Revise Pallas cephalopod dry-operation grounding

This commit is contained in:
Meta Vens 2026-05-03 10:59:32 +01:00
commit 4089a690ec
12 changed files with 582 additions and 224 deletions

View file

@ -98,7 +98,7 @@
],
"public_facts": [
{
"text": "AU Yard Twelve is a dangerous Pallas cavity-maintenance site where wet-side uplift crews, baseline riggers, and engineered seal technicians keep habitat seals inside operating margins.",
"text": "AU Yard Twelve is a dangerous Pallas cavity-maintenance site where dry-yard uplift crews, baseline riggers, and engineered seal technicians keep habitat seals inside operating margins.",
"refs": [
"aetheria.pallas_species_strikes",
"aetheria.aeronautics_unlimited",
@ -272,12 +272,12 @@
"soft-anchor loop web",
"coolant-safe clasp cluster",
"pressure-distribution cuff",
"wet-service tool rail"
"many-armed tool rail"
],
"performance_hooks": [
"maintenance reach",
"crew safety",
"wet-service throughput"
"dry-operation crawl throughput"
]
},
{
@ -319,7 +319,7 @@
"portable scrubber bridge",
"manual valve logic plate",
"tamper-evident evidence recorder",
"wet-dry crew adapter"
"dry-crawl crew adapter"
],
"performance_hooks": [
"temporary life-support margin",