1.1 KiB
1.1 KiB
Scratch
This file is disposable working memory for the current bounded subgoal.
Current Subgoal
Audit and cut persistent state so Epiphany rehydrates into a sharper machine, not a larger one.
Working Notes
notes/epiphany-fork-implementation-plan.mdhas already been distilled into a forward plan.notes/epiphany-core-harness-surfaces.mdhas already been distilled into a surface contract.state/map.yamlshould be canonical current truth, not a landed-slice trophy wall.notes/fresh-workspace-handoff.mdshould be a re-entry packet, not a full historical reconstruction.state/evidence.jsonlremains the durable history channel.notes/epiphany-current-algorithmic-map.mdmay stay long because its job is source-grounded control-flow audit, not compact re-entry.
Decision
Cut stale Phase 5 scratch after this audit lands.
The next implementation move is still Phase 6: either live-smoke
thread/epiphany/scene or design a minimal job/progress reflection surface.
Do not promote anything from this scratch into the map unless it survives verification or repeated reuse without contradiction.