Epiphany Planning Substrate
This note formalizes the long-horizon planning layer Epiphany needs around the active objective.
The active objective is the run contract. It should be narrow, adopted, and ready for coordinator routing. Everything else belongs in a planning substrate: ideas, irritants, dreams, architectural debt, GitHub Issues, roadmap themes, research questions, and "maybe we should..." conversation residue that should not vanish into transcript fog or instantly become marching orders.
Doctrine
- Conversation is not an objective.
- A backlog item is not an objective.
- A roadmap theme is not an objective.
- An objective draft is not active until the human adopts it.
- The Coordinator routes the current machine; it does not own the long horizon.
- Imagination owns future shape; Eyes owns external reality. They may work ahead while the current run continues, but neither one grants execution authority.
- Planning state must be queryable, attributable, prunable, and reviewable.
- Imported issue trackers are sources, not sources of truth.
The operating metaphor is simple:
Conversation is weather.
The planning substrate is climate.
The active objective is today's flight plan.
The Self can discuss the weather. Imagination keeps the climate map. The Coordinator flies only the adopted plan.
Product Surfaces
Conversation
The chat surface is the human-facing Self. It discusses, challenges, asks
clarifying questions, and identifies possible work, but it does not silently
mutate objective.current.
Low-confidence language such as "maybe", "I wonder", "should we", or "it might be worth" should create discussion or a candidate capture, not implementation.
Imagination
Imagination is the planning/future-shape role. It cultivates the material that is not ready to become the active objective yet:
- captures from conversation, issues, docs, and dogfood
- backlog normalization, dedupe, split, merge, and parking
- roadmap streams and sequencing arguments
- objective draft proposals with scope, evidence, risks, and review gates
- unresolved planning questions that need human judgment
Imagination should be able to run while Hands, Body, Soul, Life, and Self are
busy with the current objective. That parallel work is useful precisely because
it stays non-authoritative: it can propose backlog changes, roadmap shape, and
objective drafts, but it cannot mutate objective.current, launch
implementation, or smuggle future dreams into the current run.
Eyes and Imagination should cooperate closely. Eyes brings in outside reality: existing libraries, papers, vendor guidance, GitHub issue history, repo precedent, and similar projects. Imagination turns those findings into product shape without pretending that a pretty plan is evidence.
Inbox
The Inbox is raw captured planning material:
- user ideas from chat
- complaints and papercuts
- dreams and distant product instincts
- bugs or failures noticed during dogfood
- imported GitHub Issues
- TODOs found in repo docs
- specialist recommendations that are not part of the current objective
Inbox items can be messy. They must preserve source attribution.
Backlog
The Backlog is normalized work:
- typed
- deduplicated where possible
- given a scope and product area
- prioritized with explicit rationale
- linked to dependencies, blockers, and evidence
- mapped to possible lanes
Backlog items should be stable enough to survive rehydration and filtering.
Roadmap
The Roadmap groups backlog items into coherent workstreams. It answers "what organs are we growing and why?" rather than "what is the current run doing?"
Roadmap streams for the current Epiphany project should start with:
- GUI operator surface
- planning substrate and objective adoption
- coordinator and specialist lanes
- graph and typed state
- Rider bridge
- Unity bridge
- prompts and doctrine
- dogfood and audit artifacts
- safety and authority boundaries
Objective Draft
An Objective Draft is a proposed run contract. It has enough shape for the user to say yes, no, split it, or revise it.
Required shape:
id: objdraft-...
title: Build the planning substrate MVP
summary: >
One bounded paragraph describing the intended product outcome.
source_item_ids:
- backlog-...
scope:
includes:
- concrete thing in scope
excludes:
- tempting thing out of scope
acceptance_criteria:
- observable done condition
evidence_required:
- artifact, test, screenshot, smoke, or reviewed finding
lane_plan:
imagination: planning synthesis and objective-shape rationale
eyes: optional research needed
body: model/map updates needed
hands: implementation surfaces likely touched
soul: verification gates
life: continuity risks
dependencies:
- backlog-...
risks:
- risk and mitigation
review_gates:
- human adoption required before becoming active
status: draft
Active Objective
Only explicit human acceptance promotes an Objective Draft into the active objective. Acceptable triggers are direct commands such as "Adopt this objective", "Proceed with this objective", or a GUI Adopt Objective action.
Promotion should produce an audit record linking:
- source conversation or imported issue
- accepted objective draft
- resulting
objective.current - active subgoal ids
- acceptance criteria
- reviewer/user identity when available
Data Shapes
These are product-level shapes. Rust protocol should treat them as a design target, not a copy-paste assignment.
Planning Capture
id: capture-...
source:
kind: chat | github_issue | repo_doc | dogfood_artifact | specialist_finding
uri: optional stable source uri
imported_at: 2026-05-01T00:00:00Z
external_id: optional provider id
title: Raw captured title
body: Raw or lightly summarized content
speaker: optional human/agent/source handle
confidence: low | medium | high
tags: []
status: new | triaged | rejected | merged | promoted
Backlog Item
id: backlog-...
title: Human-readable work item
kind: feature | bug | papercut | architecture | research | debt | dogfood | dream | chore
summary: One compact paragraph
status: inbox | ready | blocked | active | done | rejected | parked
horizon: now | next | soon | later | dream
priority:
value: p0 | p1 | p2 | p3 | p4
rationale: Why this rank is true right now
confidence: low | medium | high
product_area: gui | coordinator | state | graph | rider | unity | prompts | dogfood | safety | infra
lane_hints:
- imagination
- eyes
- body
- hands
- soul
dependencies: []
blockers: []
acceptance_sketch: []
evidence_refs: []
source_refs: []
duplicate_of: optional backlog id
updated_at: 2026-05-01T00:00:00Z
Roadmap Stream
id: stream-gui
title: GUI Operator Surface
purpose: Why this stream exists
status: active | paused | later | complete
item_ids: []
near_term_focus: optional backlog id
blocked_by: []
review_cadence: ad_hoc | weekly | milestone
Prioritization Record
Priority should be explainable, not a fake-precise spreadsheet ritual.
impact: low | medium | high | critical
urgency: low | medium | high | critical
confidence: low | medium | high
effort: small | medium | large | unknown
unblocks:
- backlog id
blocks:
- backlog id
reason: >
The one-paragraph argument for the current priority.
Imagination may compute a suggested rank, but the UI must show the rationale and let the human revise it.
GitHub Issues Import
GitHub Issues are a likely source of backlog material. They should import into captures first, then normalize into backlog items after review or explicit triage.
Use GitHub as an adapter, not as the internal model.
Imagination can normalize imported issues into backlog shape. Eyes should be available when an issue points at outside tools, libraries, incidents, prior art, or research that needs a scout pass before the backlog item is trusted.
The import should preserve:
- repository full name
- issue number
- issue node id / database id when available
- html url
- title
- body
- state and state reason when available
- labels
- milestone
- assignees
- author
- comment count and optional comments
- created, updated, and closed timestamps
pull_requestmarker so PRs are not mistaken for ordinary issues- project item metadata when available
REST is enough for repository issue metadata, labels, assignees, milestones, and
comments. GitHub's REST Issues API treats pull requests as issues too, so the
adapter must explicitly detect and filter or classify PR-backed issues. GraphQL
is useful when Projects v2 fields or richer projectItems data matter.
Official references:
Imported Source Reference
source:
kind: github_issue
provider: github
repo: GameCult/Epiphany
issue_number: 123
node_id: I_kw...
database_id: 123456789
url: https://github.com/GameCult/Epiphany/issues/123
state: open
labels:
- bug
- gui
milestone: MVP
assignees:
- Meta
author: Meta
created_at: 2026-05-01T00:00:00Z
updated_at: 2026-05-01T00:00:00Z
closed_at: null
is_pull_request: false
imported_at: 2026-05-01T00:00:00Z
Import Semantics
Initial import should be read-only with respect to GitHub.
Rules:
- Do not close, label, assign, or comment on GitHub from import.
- Do not overwrite human-edited backlog fields on re-import.
- Preserve raw issue snapshots as audit artifacts or source refs.
- Update source metadata and mark stale local items when upstream issues change.
- Merge duplicates by source ref, not by fuzzy title alone.
- Keep one backlog item able to reference multiple GitHub Issues, because one product problem may be scattered across several issues.
- Keep one GitHub Issue able to split into multiple backlog items, because issue bodies often contain three problems wearing one trench coat.
Mapping Labels
Labels should inform, not dictate, Epiphany fields.
Suggested mappings:
bug: kind=bug
enhancement: kind=feature
documentation: product_area=docs
good first issue: effort=small
blocked: status=blocked
priority:high: priority=p1
dream: horizon=dream
unity: product_area=unity
rider: product_area=rider
gui: product_area=gui
research: lane_hints=[eyes]
Unknown labels stay as tags.
UI Requirements
The Epiphany GUI should eventually expose a Planning view with:
- Inbox captures, filterable by source and confidence
- Backlog table grouped by priority, horizon, product area, and status
- Roadmap streams with near-term focus
- Objective Draft queue
- Active Objective card with acceptance criteria and evidence requirements
- GitHub import status and source freshness
- "Promote to Objective Draft" action
- "Adopt Objective" action with explicit review
- "Park", "Reject", "Merge", and "Split" actions
- Imagination recommendations and unresolved planning questions
The Planning view should make it easy to discuss what matters before the machine starts moving. It should also make it hard for the current run to absorb every good idea in the room like a wet carpet.
Coordinator Boundaries
The Coordinator consumes the active objective and current typed state. It may read planning context as a source signal, but it must not:
- silently adopt objectives
- auto-prioritize the entire backlog without human review
- mutate GitHub Issues
- treat imported labels as policy
- turn roadmap dreams into implementation authority
- keep implementation running because a backlog item exists
Imagination may propose. The human adopts. The Coordinator routes.
Implementation Slices
- Documented model: this note. Landed.
- Local planning store: landed first inside
EpiphanyThreadStatewith typed captures, backlog items, roadmap streams, Objective Drafts, optional workspace root, and GitHub source refs. The current write path is revision-gatedthread/epiphany/update; extracting a workspace-shared store remains a later scaling choice. - Imagination role surface: add a prompt-backed planning/future-shape role that can synthesize captures, backlog, roadmap streams, and objective drafts alongside Eyes research without gaining adoption or implementation authority.
- Read-only planning projection: landed as
thread/epiphany/planningso GUI can render captures, backlog, roadmap, objective drafts, and active objective separation without scraping files or mutating state. - Chat capture flow: let the Self propose captures from conversation, requiring human confirmation for durable planning writes.
- Objective draft/adoption flow: add explicit draft creation and
review-gated adoption into
objective.currentand active subgoals. - GitHub import MVP: import selected repositories' open issues into captures, preserve source refs, detect PR-backed issues, and avoid GitHub mutations.
- Planning GUI: build the Planning view over the read-only projection and explicit write actions.
- GitHub sync refinement: add incremental refresh, stale detection, label mapping configuration, and optional outbound link-back only after import is boring and trustworthy.
Open Questions
- Planning currently lives inside
EpiphanyThreadStatefor the MVP. A workspace-shared planning store is still plausible once multiple threads need the same backlog without copying state. - Should GitHub import default to open issues only, or include closed issues as historical decisions?
- How should roadmaps from repo docs be imported without turning every heading into a backlog item?
- Should Imagination be a prompt role only at first, or a first-class specialist lane later?
- How much priority scoring should be computed versus manually ranked by the human?
My current bias after the first implementation slice: keep the MVP storage in typed thread state with a workspace root marker, import GitHub Issues into captures first, keep adoption explicit, and only extract a workspace planning store when repeated cross-thread copying becomes a real wound.