17 KiB
Fresh Workspace Handoff
Live boundary — 2026-08-08
The active branch is codex/epiphany-shakedown-live; pushed state is
ced86e7e. Exact cognition source ecfff489fe7e46f6ddcc9d58f0723411e8d94c13
is packaged as
sha256-6e5cd9827ab6a659c8a29f1147daf8ebec52ea3d148a16905a1401c539059d79
with witness
sha256-8d53746348eecf2afd2a5def5539dfb544e260104fb33e3e7d0eec83573ce3dc.
Starfire remains the cognition and release forge; Yggdrasil remains the small
public runtime body.
Fresh runtime
F:\Projects\.epiphany-runtime\shakedown\live-20260808-v44-clean-planning
proved the native proposal Modeling -> Imagination -> dedicated Mind planning
circuit without overrides. Mind adopted candidate
repo-frontier-plan-candidate-700b1404f73888840ea5981be736ad3b2406e72ec4ee7eba7f763d9db03e498c
and Self derived Hands route
repo-frontier-route-86b9702dd4ad3eedae2693e8af7d0b547fe00885949fa2646b3f3b6a47a6225d.
The operator-safe gate summary is
.epiphany-dogfood/v44-clean-planning-r5/coordinator-summary.json.
The adopted plan cannot be executed truthfully. Its path ceiling omits
epiphany-core/src/bin/epiphany-mvp-status.rs, the composition owner that must
project current RepoModel admission into Reorientation and CRRC. The existing
coordinator and CRRC inputs do not independently observe that admission. No
source was changed outside the gate.
This exposes a route-lifecycle defect: an adopted Hands route has no typed
refusal, relinquish, or supersession transition when implementation inspection
falsifies its plan. epiphany.hands.action_refusal_receipt is named in the
contract catalog but has no persisted type, writer, CLI command, or route
terminalization semantics. The only implemented terminal path requires a
patch, command, commit, verification request, Soul verdict, and verdict
incorporation. Do not fabricate that consequence chain or mutate the v44 store
by hand.
Active work
The exact root release bundle has now proved release incremental compilation:
its fresh-target build took 1226.69 seconds, then a touched-core rebuild took
31.47 seconds versus the 7m04s baseline (about 13.5x faster). Evidence is in
.epiphany-run/build-benchmarks/incremental-root-20260808/result.json.
The independent incremental-plus-rust-lld trial completed at 1097.14 seconds
cold and 29.34 seconds after touching core. Its evidence is under
.epiphany-run/build-benchmarks/lld-incremental-root-20260808. The linker saved
only 2.13 seconds (about 6.8 percent) on the iteration path and required a
toolchain-specific Windows linker location, so it is not repository policy.
Root [profile.release] incremental = true is the adopted portable change.
This build-configuration edit is an explicit operator-requested supervisor
intervention, not evidence that the sealed v44 Hands route performed it.
Exact commit 388c49bca8ece81b8ad1d41ca075a3bea9654d67 packaged 21 binaries as
sha256-1c63d13fd18b24492376c87425f9c68859075e7032a73566823396ae4e31cb06
with witness
sha256-01b526d6ef87be91995e3c5ab5d053b4e6a840132d2a0612436096f31268d023.
Exact inspection and CultMesh catalog publication passed. The release is not
active; resident daemons retain their prior pinned release.
After the build benchmark, first give adopted Hands work a typed refusal/relinquish path that preserves Mind's plan authority, records why Hands cannot proceed, and returns frontier ownership to a lawful replanning state. Then replay v44, reject the incomplete plan through that path, adopt a corrected plan including the status-composition owner, and prove CRRC -> accepted Reorientation -> Continuity recovery -> Soul closure.
Fresh runtime
F:\Projects\.epiphany-runtime\shakedown\live-20260808-v45-hands-relinquishment
was copied from the pre-planning v42 boundary; v44 remains sealed. Typed
proposal operator-hands-route-relinquishment-v1 was selected as Modeling
request
repo-frontier-proposal-modeling-5c0ce91b6d30d16c31087088ac613f893a4b65f430cc6fb7fe20faa1bfccde6a
with payload digest
01e6bdc556e7cad6dbfcae93ad5f82fd57794af11b3dafb39ecb3747a19f6dfb.
One bounded active-release coordinator step launched the proposal-bound
Modeling worker. Its typed result completed reviewable and proposal-bound, but
Mind correctly refused acceptance with Evolution cannot bypass a current route or own verdict-driven frontier lifecycle. Copying v42 was therefore not
a route-free planning boundary: it retained a current-model route even though
its operator action was awaitFrontierProposal. Preserve v45 and artifacts in
.epiphany-dogfood/v45-hands-relinquishment-r2/r3 as negative evidence; do
not weaken the guard or replay the consumed result. Reconstruct the genuinely
clean boundary used before v44, then resubmit the same typed proposal.
Persona consequence, bounded retention, crash/restart closure, endurance and resource plateau, and Linux/Yggdrasil cognition remain open. v22 and earlier shakedown scars remain in git and the typed evidence ledger; they are not active rehydration state.
Route-free recovery and planning failure — v46/v47
Fresh v46 at
F:\Projects\.epiphany-runtime\shakedown\live-20260808-v46-route-free-relinquishment
was bootstrapped natively from the repository Body rather than copied from an
old coordinator store. It accepted the explicit objective, selected proposal
operator-hands-route-relinquishment-v1, and accepted a source-grounded,
proposal-bound Modeling result. Modeling included
epiphany-core/src/bin/epiphany-mvp-status.rs in the frontier scope, proving the
route-free recovery boundary that v45 lacked.
Canonical Imagination then returned a candidate that failed current request
validation with frontier planning candidate substituted request identity or required cargo. The generic runtime job was correctly marked Failed, but no
epiphany.runtime.role_worker_result failure projection was persisted. Self's
planning lifecycle consumes that typed role result, not the generic job, so it
remained falsely at imaginationRunning after the worker exited. Native
interrupt could mark the thread binding blocked but could not create the
missing typed failure or lawful retry. Preserve v46 as negative evidence; do
not edit its store or read its raw worker output.
Fresh retry v47 is
F:\Projects\.epiphany-runtime\shakedown\live-20260808-v47-route-free-relinquishment-retry
on thread shakedown-v47-hands-relinquishment-r1. Its proposal payload is
sha256-06f21aa478a3f6374b9c42bcd0d75320dfd0c354204be69169b67a9ddb13506a
and selected Modeling request is
repo-frontier-proposal-modeling-ff89a288603b4b26ba86a728240d03710b45516c7bb5d3e6d02e7a63bb41cf70.
The scope hints use the actual source owners: hands_gateway.rs,
mind_gateway.rs, repo_model_gateway.rs, runtime_spine.rs, the Hands CLI,
epiphany-mvp-status.rs, and the app server. Active-release proposal Modeling
completed and was accepted under the operator-safe artifact directories
.epiphany-dogfood/v47-hands-relinquishment-modeling-r0 and
.epiphany-dogfood/v47-hands-relinquishment-modeling-accept-r1.
v47 canonical Imagination then failed identically to v46. Generic runtime job
43a3855c-8445-4c0d-8fa2-85576ef6d631 is Failed with the same candidate
identity/cargo validator error, while frontier lifecycle remains
imaginationRunning with no typed result. This independent reproduction rules
out a one-off detached-process race. Do not create v48: planning cannot adopt
the repair because the failure is before the typed result Self needs to review
or retry planning.
The operator explicitly authorized proactive intervention in corrupted Epiphany runtime state, with receipts. The labeled supervisor intervention is now implemented in source. The OpenAI runtime canonicalizes set-shaped safe paths before identity validation and persists a non-executable typed role failure beside the generic failed runtime job. Self owns explicit reviewed supersession and creates monotonic immutable retry bindings for both Imagination planning and dedicated Mind judgment; failure alone cannot retry, old attempts remain evidence, and candidate/decision cargo is forbidden on the failure projection. Focused core, coordinator, and runtime tests pass, including symmetric Imagination and Mind failure/review/retry proofs. The next move is commit/push, one exact incremental authenticated package, and a fresh route-free live proof. v46 and v47 remain sealed and must not be repaired in place.
Exact repair commit a6c238721363462712a2f6a1b0df0b3d9cfc072c is packaged
as sha256-5605ff00ffea1fce8f679868ae1081215707ef881cc5795172385aae27f96f0c
with witness
sha256-d9ed1d70a3e1db42b23761991a961f8e9c60531bd480ba01db7e8669a8bfd0e2.
Fresh v48 at
F:\Projects\.epiphany-runtime\shakedown\live-20260808-v48-planning-recovery
proved authenticated cold bootstrap from the repository Body and canonical
state/agents.msgpack, proposal-bound Modeling job
7fe64b71-7cfc-4738-bbf0-5247605f4afa, and Mind RepoModel admission. The
reconstructed operator proposal used implementation wording, so Modeling
lawfully admitted a direct Hands frontier. Operator proposals intentionally
permit Hands, Eyes, or Imagination; only autonomous Imagination proposals are
forced back through Imagination. Preserve v48 as a valid direct-Hands proof,
not as planning-retry evidence. The next run must explicitly request an
unadopted Imagination-planning frontier so canonical Imagination and dedicated
Mind exercise the repaired seam.
Fresh v49 at
F:\Projects\.epiphany-runtime\shakedown\live-20260808-v49-imagination-planning-recovery
then proved that exact circuit. Proposal Modeling job
f5569a90-6a74-4e54-888d-dee5a8d6ebd7 was accepted; Self committed planning
request repo-frontier-planning-d6a08a211c0aa7fa5e86662a8dc19615ce8a400c291364ab172979bc0b9df680;
canonical Imagination job f3c85838-7fa8-4863-8f6b-baa47cfad8db
produced a valid candidate; dedicated Mind job
c2931b60-f981-4f28-a6f6-af2e77156a53 returned its judgment; and Mind
committed terminal decision
repo-frontier-plan-decision-42a250a3af0dc17fea3074ec0321b4eadf674b197ee04c67515ffcb5783a9b1f.
Self derived exact Hands route
repo-frontier-route-d4d595821804c3f5bbe24d06084762ed19c3185a945827dfa6b10c53df798e2e.
The operator-safe gate is
.epiphany-dogfood/v49-hands-gate-r7/coordinator-summary.json. Its six paths
are the complete implementation owner set at that revision. The earlier claim
that vendor/codex/codex-rs/app-server/src/epiphany.rs was an omitted owner was
stale archaeology: that source does not exist and the vendored app-server has
no Epiphany projection. Do not mutate source under the historical v49 route,
because the newly discovered relinquishment transaction was never part of its
adopted plan. Preserve v49 and implement the missing typed relinquishment path
as a labeled supervisor intervention across the state model and real six-file
owner set, then exercise it against a fresh incomplete route.
The labeled supervisor implementation is now local. Hands persists
HandsActionRefusalReceipt; Mind atomically retires the exact frontier and
writes review, admission, projection-obligation, and
RepoFrontierRelinquishmentReceipt companions through
relinquish_repo_frontier_hands_route. The transaction requires one current
route authority, at least one missing safe path outside route scope, and zero
patch/command/commit/PR consequences. Exact replay is idempotent; collision,
already-authorized paths, existing consequences, and reuse of the stale route
fail closed. epiphany-hands-action record-refusal is the operator mouth and
native status projects frontierRelinquishment.
Focused proof is green: two relinquishment tests, all five existing Hands CLI
tests, both native status tests, and the state-model test pass. A broad
645-test library run passed 642 with one ignored and found two failures in
unchanged test bodies: autonomous direction ingestion expected one pressure
but observed zero, and the route eligibility test attempted to admit a
non-active proposal frontier that current admission already forbids. Both
failures reproduce unchanged in an isolated worktree at pushed HEAD
d1d9cd10; they are pre-existing suite corrosion, not regressions from the new
patch-purpose enum. The temporary baseline worktree was removed after the
comparison. Commit and push this pass, then package its exact source once.
The baseline worktree used temporary junctions for gitlink dependencies; its
forced removal cleared the live cultcache-rs and cultnet-rs submodule
worktrees. The evidence write caught the damage immediately. Both were restored
with git submodule update --init --checkout to pinned SHAs 7676a4c2 and
fab5b31d, and git submodule status is clean. Do not reuse junctioned live
submodule targets for future baseline archives.
Exact relinquishment commit 182a591369131d621461947723e7fb71637fa386
is pushed and packaged as
sha256-b194a1850071739d62f1dd820529a511d2e7d07286d451506f1021e05e796143
with witness
sha256-455e715919444c98528986ee3a88aeb6daffd187d57d5202a15d7e9e688c1979.
Sealed v50 at
F:\Projects\.epiphany-runtime\shakedown\live-20260808-v50-hands-relinquishment
proved record-refusal, atomic frontier retirement, native
frontierRelinquishment, and structural invalidation of the historical v49
route. Corrected proposal Modeling eventually admitted RepoModel revision 4
after two invalid patches were rejected and a transient provider HTTP 503 was
recorded as typed failure
role-failure-review-497e06aa-663d-4b1d-b55f-1e46629f6227.
The resulting planning request
repo-frontier-planning-d3f0f49859819409fcc7453c33039feee0a3c29f636c4b216ef241a98d5bdce4
correctly targeted eight source owners. Both canonical Imagination attempts
failed closed with frontier planning candidate exceeds exact frontier authority; receipts are
frontier-planning-failure-review-1fff4758-7f85-4800-9dda-4f0bcc35ccf6
and worker result result-worker-030c6e8e-50b9-482c-9c28-613a0360bbe9.
Source diagnosis found the validator correct but the model context incomplete:
neither epiphany_frontier_planning_output_schema nor the OpenAI runtime output
contract said that safe_paths must equal or descend from immutable
source_scope. A local focused repair states that invariant and tells
Imagination to put useful adjacent paths in stop conditions instead of silently
expanding authority. Focused core and OpenAI-runtime tests pass. Commit and
push, package once, clone v50 into a fresh runtime, and replay a fresh proposal
through Modeling, canonical Imagination, and dedicated Mind. Do not retry the
consumed v50 request again.
Commit 88778762d6fde2c640ba6cd98d3a426226ce3da7 is pushed and packaged as
sha256-4e0700d3e2305a343742608b06054faa4ab1ce4fb5a0fcef6ef1c8ee0efea914
with witness
sha256-f434d5a480e5a1d54fef4cb18f93e391bc3cbd9669fd9ed6f7111f35a2d8a536.
The stable release cache completed the changed core/runtime bundle in 1m34s.
Fresh v51 at
F:\Projects\.epiphany-runtime\shakedown\live-20260808-v51-imagination-scope-context
is cloned from sealed v50 and has this exact release published. Proposal v6
launched source-grounded Modeling result
result-worker-51add51b-d949-4500-b49d-77e9ebd198c6, which remains pending
behind the older current planning lifecycle.
After reviewing v50's preserved second Imagination failure, v51 replayed the
same planning request under the corrected context. The candidate passed the
safe-path ceiling and then failed with frontier planning result does not exactly bind request, launch, runtime, thread, and candidate. Source inspection
found a deterministic retry bug: Self persists retry binding IDs with
-attempt-N, but runtime result validation demanded the attempt-zero ID for
all attempts. The local repair derives the expected ID from
binding.attempt_ordinal. The focused test now persists a valid retry result
and proves lifecycle ImaginationResultReady. Commit/push/package this repair,
clone sealed v51 into v52, review its typed failure, and replay the same
authority. Do not mutate v51 further.
Exact retry repair 5b922a049fc139bfcf2882ffb5e5cec8f17b65fb is pushed and
packaged as
sha256-a019000d541fea02f7fda93dbbdc4f0bdcf8d6e2bc33a9ec4f38270dca2f26b1
with witness
sha256-97937ae68206b26a09ba3479cf8865acf36b30f9686d15abf1663561afd1abab.
Fresh v52 at
F:\Projects\.epiphany-runtime\shakedown\live-20260808-v52-imagination-retry-identity
reviewed v51 failure with receipt
frontier-planning-failure-review-3987cb31-2d67-4fbe-98d7-7c512c27c31a.
Canonical Imagination retry result
result-worker-ff2aa229-11d2-4ace-b12e-4eb48ab3e617 persisted successfully.
Dedicated Mind result
result-worker-6940aad8-a458-4d7a-847f-c412f0d9bc7c adopted candidate
repo-frontier-plan-candidate-e8374ddfccd0f4e9c8bf16931e582c6e42a7d90de7587aaf3e9826e149752bb4
through decision
repo-frontier-plan-decision-0f762c79a9b0a19a24f77e34865a9edc0034f1601c52c9401bd255f7ed67432d.
RepoModel advanced to revision 5 and native runtime status reports
actionable frontiers: Hands=true Eyes=false.
The pending v6 Modeling result was then correctly rejected as stale against
revision 5. Its reviewed proposal failure caused coordinator Self to return
awaitFrontierProposal before consulting the current Hands signal. This is a
decision-order fault: stale worker history cannot preempt newer Mind authority.
The local repair excludes that exact state from completed-result recovery;
without Hands authority the old fail-closed behavior remains. The focused
coordinator test proves both branches. Commit/push/package, clone v52 into v53,
and prove native coordinator ContinueImplementation plus the exact Hands
gate. Also audit why the adopted decision serialized model-supplied
2025-02-14T00:00:00Z instead of a coordinator-owned commit timestamp.