CI: concurrency group, no cancel on dispatch #4

Merged
libby merged 2 commits from libby/ci-concurrency into main 2026-11-10 17:40:15 +00:00
Member

Workflow-only. Adds concurrency (group workflow+ref; cancel-in-progress except workflow_dispatch) to portable-contracts.yml. No tag/release trigger exists. Motivation: capacity-1 runner flooded by superseded pushes. Merge waits on this PR's own CI green.

🤖 Generated with Claude Code

Workflow-only. Adds `concurrency` (group workflow+ref; cancel-in-progress except workflow_dispatch) to portable-contracts.yml. No tag/release trigger exists. Motivation: capacity-1 runner flooded by superseded pushes. Merge waits on this PR's own CI green. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
CI: concurrency group on portable-contracts
Some checks failed
Portable Eve contracts and browser lowering / ubuntu-latest eve-browser-lowering (pull_request) Failing after 33s
Portable Eve contracts and browser lowering / ubuntu-latest eve-contracts (pull_request) Failing after 27s
8d447bcfa6
Group per workflow + ref; cancel-in-progress on push and pull_request,
never on workflow_dispatch. The workflow has no tag or release trigger.

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
CI: retrigger (run 951 died at checkout: forge name did not resolve)
All checks were successful
Portable Eve contracts and browser lowering / ubuntu-latest eve-browser-lowering (pull_request) Successful in 2m17s
Portable Eve contracts and browser lowering / ubuntu-latest eve-contracts (pull_request) Successful in 1m58s
5c30ede51c
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
libby merged commit fd7a48484d into main 2026-11-10 17:40:15 +00:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
GameCult/Thing!4
No description provided.