Define Moonlight reliability acceptance gate

This commit is contained in:
Meta Vens 2026-07-16 21:35:47 +01:00
commit b0f33c36b4
4 changed files with 66 additions and 0 deletions

View file

@ -465,6 +465,15 @@ the 40 ms reorder budget and feeds them through the existing playout owner.
Both sides use the experimental CultLib/CultMesh snapshot lineage used by Eve,
Aetheria, and VoidBot; no stable-branch transport shim was introduced.
Receiver pressure now closes into the long-lived NVENC encoder as bounded AIMD
bitrate control. Late/decode/repair/queue pressure backs off by 15 percent;
clean recovery adds five percent of the configured ceiling only after two
stable seconds. The live encoder proof reconfigured 12 Mbps to 6 Mbps without a
restart and emitted the required transition IDR. The exact remaining completion
gate is tracked in
`docs/research/moonlight-reliability-acceptance-2026-07-16.md`; no cross-host
claim is allowed until its Raven-to-Starfire field matrix passes.
The production receiver follow-up fixed two contract contradictions: early
video repair no longer declares the frame late (which had made Odin discard all
repair requests), and the OBS audio decoder now consumes Muninn's actual float