Harden Muninn OBS recovery from Moonlight field study

This commit is contained in:
Meta Vens 2026-07-17 05:48:31 +01:00
commit 1221583c23
10 changed files with 438 additions and 126 deletions

View file

@ -452,12 +452,15 @@ The first cut landed in Odin on 2026-07-16: experimental CultLib snapshot
`8965f3c0`, epoch/sequence/edge-ack HID delivery, 100 ms default LAN media
deadline, CultNet `realtime` A/V delivery, bounded queues, expiring/late-aware
repair, and decode-chain-owned keyframe pressure. The production video path now
uses typed V3 Cauchy GF(256) FEC with sixteen parity shards per access unit;
the OBS receiver reconstructs arbitrary erasure sets up to the received parity
count, while V2 stripe parity remains a distinct non-authoritative schema.
Sender access units enter the handoff queue independently, and CultMesh catalog
publication runs outside the realtime media loop. The remaining work is the
full direct/proxy impairment matrix, Opus FEC/PLC, and long-duration mixed soak.
uses typed V4 Cauchy GF(256) FEC in independent 8-data/8-parity blocks. Each
block schedules data and parity as separate lanes, including fixed protection
for a short tail block. Canonical video and parity use CultNet's unreliable
`realtime` lane; selective repair and IDR recovery remain deadline-bound.
Canonical audio and its parity also use `realtime`; 4+2 FEC, reorder, and
concealment own continuity without an ACK/retransmit window. Sender access units enter the
handoff queue independently, and CultMesh catalog publication runs outside the
realtime media loop. The remaining work is the full direct/proxy impairment
matrix, Opus FEC/PLC, and long-duration mixed soak.
The socket harness and bounded PCM loss recovery have now landed. Odin's
`cultnet-impair` proxy supplies deterministic seeded loss/burst/reorder/
@ -469,9 +472,11 @@ Both sides use the experimental CultLib/CultMesh snapshot lineage used by Eve,
Aetheria, and VoidBot; no stable-branch transport shim was introduced.
Receiver pressure now closes into the long-lived NVENC encoder as bounded AIMD
bitrate control. Late/decode/repair/queue pressure backs off by 15 percent;
clean recovery adds five percent of the configured ceiling only after two
stable seconds. The live encoder proof reconfigured 12 Mbps to 6 Mbps without a
bitrate control. Startup begins at half of the configured encoder ceiling
because fixed block parity can roughly double wire rate, and additive recovery
is capped at half of that configured ceiling. Late/decode/repair/queue
pressure backs off by 15 percent; clean recovery adds one-fiftieth of the safe
cap only after ten stable seconds. The live encoder proof reconfigured 12 Mbps to 6 Mbps without a
restart and emitted the required transition IDR. The exact remaining completion
gate is tracked in
`docs/research/moonlight-reliability-acceptance-2026-07-16.md`; no cross-host
@ -485,11 +490,13 @@ with short silence concealment. The next audio cut is Opus with explicit
FEC/PLC for variable-rate compressed audio; PCM now has bounded 4+2 erasure
recovery plus concealment. The controllable video encoder owner now exists and
forces the next NVENC frame to IDR without restarting the video session. A live
D3D11 desktop proof verified the command-generated IDR. The remaining field
cut is to install its bundle on Raven, route the existing activation task
through `--video-encoder`, and run the named impairment profiles. Raven's
WireGuard SSH route timed out during the first deployment attempt, so no
interactive workstation task was disturbed.
D3D11 desktop proof verified the command-generated IDR. The Raven bundle and
OBS receiver are now deployed over the direct LAN route. Raven activation is an
interactive-token scheduled task whose PowerShell action uses
`-WindowStyle Hidden`; no WireGuard path or foreground terminal is part of the
runtime. The active field cut uses D3D11/NVENC video, WASAPI loopback audio,
typed CultNet media, and the experimental CultLib lineage. The named direct and
proxy impairment profiles and long soak remain the completion gate.
1. Replace the frame-event diagnostic bridge with concrete direct capture
drivers for Leap stereo IR first, then the