Briefs: a merge pass never rebases on a rejected push #20

Merged
eureka merged 3 commits from self/merge-never-rebases into main 2026-11-05 10:57:34 +00:00
Owner

Rebase on a rejected push flattened the reveals-replace-tiers merge to Aetheria master and dropped its merge-time test fixes (master 07854ed5 did not compile; repaired forward in 20cd1d7c). Cut branches keep pull --rebase; merge passes fetch and merge origin/master into their verified merge, re-verify, and push. Changelog entry 2026-10-13.

?? Generated with Claude Code

Rebase on a rejected push flattened the reveals-replace-tiers merge to Aetheria master and dropped its merge-time test fixes (master 07854ed5 did not compile; repaired forward in 20cd1d7c). Cut branches keep pull --rebase; merge passes fetch and merge origin/master into their verified merge, re-verify, and push. Changelog entry 2026-10-13. ?? Generated with [Claude Code](https://claude.com/claude-code)
Rebase flattened the reveals-replace-tiers merge and dropped its merge-time
test fixes; Aetheria master 07854ed5 did not compile. Cut branches keep
pull --rebase; merges to master fetch and merge origin/master instead.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
An Imagination pass edited the operator's checkout (stale map, beside her
uncommitted work); <path> is now a worktree Self names. Withdrawing a
withdrawal and admitting the next revision in one batch is refused
WouldReinstateOverLater.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
eureka merged commit 4175d483bb into main 2026-11-05 10:57:34 +00:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
GameCult/Eureka!20
No description provided.