Record v27 proposal contract boundary
This commit is contained in:
parent
17d4ae47ca
commit
fd61483301
3 changed files with 45 additions and 41 deletions
|
|
@ -1,53 +1,57 @@
|
|||
# Fresh Workspace Handoff
|
||||
|
||||
## Current authority — 2026-08-07 Hands binding cut
|
||||
## Current authority — 2026-08-07 v27 contract boundary
|
||||
|
||||
The active branch is `codex/epiphany-shakedown-live`. Exact pushed commit
|
||||
`4338b0331a374802c649aa2a647a9c39f9a9f92d` is authenticated and published as
|
||||
`sha256-1023d71c625706694cc67e034172b9f33ea331594924c5e7b786d0818f077a21`
|
||||
`17d4ae47ca6faa1613707010d19261a75a6b74ee` is authenticated and published as
|
||||
`sha256-0afab25ce4a30895f8183966a709786c51230c11acc35dd6eb3e83ae0bb79fe4`
|
||||
with witness
|
||||
`sha256-0d351a7001c01a46b46207a9364e6221325d3811cd2cccfd72786430115282be`.
|
||||
The package contains 21 binaries and exposes no private state.
|
||||
`sha256-2e9e8a53659e7351ca6d9b297908a35c54dde3047a654fe61f2d7a8b3d8b186c`.
|
||||
The package contains 21 binaries and exposes no private state. Starfire remains
|
||||
the release forge; Yggdrasil remains the small runtime target.
|
||||
|
||||
Fresh v26 lives at
|
||||
`F:\Projects\.epiphany-runtime\shakedown\live-20260807-v26`. It was cold-started
|
||||
from the packaged repository-body tool at Git head `4338b033`; only canonical
|
||||
`agents.cc` crossed from v25. The exact release was published into its fresh
|
||||
local Verse.
|
||||
Fresh v27 lives at
|
||||
`F:\Projects\.epiphany-runtime\shakedown\live-20260807-v27`. It was cold-started
|
||||
from the packaged repository-body tool; only canonical `agents.cc` crossed from
|
||||
v26. Its local Verse first proved fail-closure while unseeded, then was seeded
|
||||
for `repo:F:/Projects/Epiphany` and received the exact release publication.
|
||||
|
||||
Proposal `shakedown-v26-continuity-imagination-r1` was selected without a
|
||||
Generic user proposal `shakedown-v27-hands-continuity-r1` was selected without a
|
||||
routing override. Packaged Self derived `launchModeling`; job
|
||||
`6683204c-d2d5-46f2-a518-c355268afcf1` completed and was accepted. Its exact
|
||||
canonical Imagination frontier became eligible, Self launched Imagination job
|
||||
`b2c01a84-b006-4483-afd1-1dc4af4cebf1`, and dedicated Mind job
|
||||
`7daa2630-0ea2-4adf-b17a-24f0c3c7037e` returned `adopt`.
|
||||
`ee6cdaf1-28d4-4ffa-8c9e-171f822524c8` completed and the first result was
|
||||
accepted as `accept-modeling-result-worker-ee6cdaf1-28d4-4ffa-8c9e-171f822524c8`.
|
||||
The result was source-grounded in the repaired coordinator seam but inspected
|
||||
only `epiphany-mvp-coordinator.rs`. It created an active frontier recommending
|
||||
Hands. Self therefore emitted ready route
|
||||
`repo-frontier-route-2a6f1480b9fa431e26dee6db5290b3b234d7bbb541947737d08dcb2e9f0cb48e`.
|
||||
|
||||
The decision commit admitted the plan and selected the resulting Hands route.
|
||||
The next gate failed with `repo frontier Hands authority chain violates its full
|
||||
authority contract`. The validator is correct: `record_hands_implementation_gate`
|
||||
persisted empty `frontier_route_id`, `plan_candidate_sha256`, and `plan_action`
|
||||
even though the selected route carried an adopted plan. v26 is failure evidence;
|
||||
do not mutate or replay it.
|
||||
|
||||
The local cut derives those three intent fields from the selected route's
|
||||
adopted plan. The existing no-plan path remains empty by derivation. The focused
|
||||
regression test now seeds an adopted plan and proves persisted intent identity;
|
||||
all 14 coordinator binary tests pass.
|
||||
This is not the required adopted-plan proof. Generic user proposals may
|
||||
legitimately recommend Hands; only autonomous Imagination-origin proposals are
|
||||
structurally restricted to an unadopted Imagination frontier. v27 therefore
|
||||
proved generic proposal-to-Hands routing and the no-plan Hands gate, not native
|
||||
Modeling-to-Imagination-to-Mind or the repaired adopted-plan identity. Preserve
|
||||
v27 as evidence. Do not execute its Hands command as if it proved the requested
|
||||
chain.
|
||||
|
||||
## Next action
|
||||
|
||||
Commit and push the Hands binding cut, then package and publish that exact
|
||||
commit. Preserve v26 and cold-start a clean generation. Replay the native path
|
||||
without overrides and prove:
|
||||
Cold-start a clean generation using the autonomous Imagination-origin proposal
|
||||
crossing rather than generic intake. Without overrides, prove:
|
||||
|
||||
1. Self derives proposal-bound Modeling and canonical Imagination.
|
||||
2. Dedicated Mind adopts the typed candidate.
|
||||
3. Hands intent exactly echoes route id, candidate digest, and plan action.
|
||||
4. RepoFrontierHandsAuthority binds route, model, plan, intent, review, grant,
|
||||
1. Self derives proposal-bound Modeling and the admission contract requires a
|
||||
canonical unadopted Imagination frontier.
|
||||
2. Self selects and launches canonical Imagination.
|
||||
3. Dedicated Mind adopts the typed candidate.
|
||||
4. Hands intent exactly echoes route id, candidate digest, and plan action.
|
||||
5. RepoFrontierHandsAuthority binds route, model, plan, intent, review, grant,
|
||||
and sorted scope.
|
||||
5. Execute the bounded Continuity crash/restart/closure proof and capture Soul
|
||||
6. Execute the bounded Continuity crash/restart/closure proof and capture Soul
|
||||
evidence rather than treating the gate as completion.
|
||||
|
||||
Do not add a global rule forcing generic user proposals through Imagination;
|
||||
that would destroy their valid direct Hands/Eyes semantics to repair a test
|
||||
fixture. Use the existing owner-aligned autonomous crossing.
|
||||
|
||||
After that, continue the actual readiness campaign. Persona public consequence,
|
||||
retention bounds, long-duration resource behavior, and Linux/Yggdrasil cognition
|
||||
remain open. Yggdrasil is the small canonical public crossing Body; Starfire
|
||||
|
|
|
|||
Binary file not shown.
|
|
@ -34,15 +34,15 @@ invariants:
|
|||
- Evidence and git retain history; this map retains only state that changes future decisions.
|
||||
|
||||
current_status:
|
||||
summary: Epiphany is a supervised engineering alpha on Starfire, not deployment-ready. Exact pushed 4338b033 is authenticated and published as sha256-1023d71c with witness sha256-0d351a70. Clean v26 proved the native proposal chain through dedicated Mind without routing overrides: Self launched Modeling, Mind admitted its exact canonical Imagination frontier, Self launched Imagination, and dedicated Mind returned adopt. The subsequent Hands gate exposed a coordinator authority-binding defect: the persisted route carried an adopted plan, but record_hands_implementation_gate emitted empty route/plan fields, so the correct runtime validator refused the chain. The local cut derives the Hands intent's route id, candidate digest, and action from the adopted route; all 14 coordinator tests pass. v26 is preserved as failure evidence until the fixed commit is packaged and replayed in a clean generation. Persona consequence, Continuity execution, retention, long-duration pacing, and Linux/Yggdrasil cognition remain open.
|
||||
summary: Epiphany is a supervised engineering alpha on Starfire, not deployment-ready. Exact pushed 17d4ae47 is authenticated and published as sha256-0afab25c with witness sha256-2e9e8a53. Clean v27 proved local-Verse fail-closure, exact release publication, native proposal-bound Modeling launch, and first-valid Mind acceptance without routing overrides. The accepted generic user proposal legitimately produced a direct Hands frontier, so Self emitted a ready no-plan Hands gate. That proves generic proposal-to-Hands routing but does not prove the repaired adopted-plan binding. v27 is preserved as a test-design boundary: only the autonomous Imagination-origin proposal path structurally requires Modeling to emit an unadopted Imagination frontier, followed by canonical Imagination and dedicated Mind adoption. The next clean generation must use that owner-aligned path. Persona consequence, Continuity execution, retention, long-duration pacing, and Linux/Yggdrasil cognition remain open.
|
||||
operational_state:
|
||||
local_worktree: adopted_plan_hands_authority_binding_repair_uncommitted
|
||||
local_worktree: clean_exact_17d4ae47
|
||||
operator_wireguard: restored
|
||||
yggdrasil: canonical_small_public_crossing_body
|
||||
starfire: temporary_epiphany_cognition_body
|
||||
starfire_runtime_identity: epiphany-starfire
|
||||
starfire_swarm_brake: released
|
||||
starfire_release: authenticated_4338b033_published_v26_native_mind_chain_proven
|
||||
starfire_release: authenticated_17d4ae47_published_v27_generic_proposal_hands_gate_proven
|
||||
starfire_repository_body: bound_and_observed
|
||||
starfire_verse_topology: bound_to_current_repository_body
|
||||
starfire_native_status: supervised_shakedown_active
|
||||
|
|
@ -52,8 +52,8 @@ current_status:
|
|||
bifrost_feedback_crossing: authenticated_transport_only
|
||||
yggdrasil_epiphany_services: absent
|
||||
resident_physiology: heartbeat_and_self_running
|
||||
unresolved_authority: v26 committed the adopted plan and selected its Hands route, then failed before persisting RepoFrontierHandsAuthority because the coordinator's intent did not echo the route's adopted-plan identity. The local owner-aligned repair is test-proven but unpublished. A clean generation must prove the repaired route-to-intent-to-review-to-grant chain and then execute the bounded Continuity proof. Persona consequence, retention, long-duration behavior, and Linux/Yggdrasil cognition remain open.
|
||||
next_action: Commit, push, package, and publish the adopted-plan Hands binding repair. Preserve v26 as evidence, cold-start a clean generation, replay native Modeling-to-Imagination-to-Mind, and prove the resulting Hands authority exactly binds route, model, adopted plan, intent, review, grant, and scope before executing the Continuity crash/restart/closure plan.
|
||||
unresolved_authority: Exact 17d4ae47 contains the test-proven adopted-plan Hands binding repair, but v27 exercised the generic user-proposal contract and therefore created a direct no-plan Hands route. The live package has not yet proved route-to-adopted-plan-to-intent-to-review-to-grant identity. A clean generation must enter through the autonomous Imagination-origin proposal crossing, whose admission contract makes the required Imagination and Mind stages structurally unavoidable, then execute the bounded Continuity proof. Persona consequence, retention, long-duration behavior, and Linux/Yggdrasil cognition remain open.
|
||||
next_action: Preserve v27 as generic proposal-to-Hands evidence. Cold-start a clean generation through the autonomous Imagination-origin proposal path and prove native proposal Modeling, canonical Imagination, dedicated Mind adoption, and exact adopted-plan Hands authority without overrides. Then execute the Continuity crash/restart/closure plan and capture Soul evidence.
|
||||
|
||||
active_subgoals:
|
||||
- Prove Persona, Self, Eyes, Modeling, Imagination, Hands, Soul, Mind, Continuity, and nervous-system behavior individually.
|
||||
|
|
@ -63,7 +63,7 @@ active_subgoals:
|
|||
|
||||
organ_readiness:
|
||||
persona: partial; authenticated feedback transport is live, but public cognition and speech consequence still need a fresh end-to-end proof.
|
||||
self: partial; proposal recovery, Mind admission, Hands routing, Soul routing, verdict incorporation, proposal preemption, challenge-aware Eyes routing, in-process status ownership, and single-use Research-to-Modeling routing are live. Exact 4338b033 proved native proposal Modeling, canonical Imagination selection, Imagination launch, and dedicated Mind decision without overrides; the downstream coordinator Hands binding still needs packaged proof.
|
||||
self: partial; proposal recovery, Mind admission, Hands routing, Soul routing, verdict incorporation, proposal preemption, challenge-aware Eyes routing, in-process status ownership, and single-use Research-to-Modeling routing are live. Exact 17d4ae47 additionally proved native generic proposal Modeling and direct no-plan Hands gate derivation without overrides; the packaged adopted-plan binding still needs proof through the autonomous Imagination-origin path.
|
||||
eyes: proven for one bounded challenged-claim circuit; exact 84f00929 launched Research and Mind accepted the first source-gap packet with typed evidence/checkpoint, exact 148d4527 accepted its causal reorientation, and exact 6f019cf8 proved downstream Modeling consumption.
|
||||
modeling: proven for the current bounded circuit; proposal-bound source inspection, Mind admission, exact routed identity preservation, and first-valid verdict incorporation completed without retry churn. Broader Body-map coverage remains open.
|
||||
imagination: proven for one bounded live circuit; exact 4338b033 selected the admitted canonical frontier, launched Imagination, persisted its typed candidate, and handed it to dedicated Mind without overrides. Broader option generation remains open.
|
||||
|
|
|
|||
Reference in a new issue