Record Ox12 retry falsification

This commit is contained in:
Meta Vens 2026-08-22 19:29:15 +02:00
commit ec9f9850f9
5 changed files with 117 additions and 70 deletions

View file

@ -1,8 +1,8 @@
# Epiphany current algorithmic map
Updated: 2026-08-22
Latest committed implementation cut: `d48f69b7` on `codex/epiphany-shakedown-live`
Current worktree cut: Ox10 documentation and evidence reconciliation
Latest committed implementation cut: `9b9b5c85` on `codex/epiphany-shakedown-live`
Current worktree cut: Ox12 documentation and evidence reconciliation
This document describes the live machine. Historical cuts, rejected paths, and
proof chronology belong in git, `state/ledgers.msgpack`, and bounded smoke
@ -235,16 +235,21 @@ flowchart TD
Eyes may create evidence that creates Modeling work. Eyes acceptance never
suppresses or authorizes ordinary Body Modeling.
Each unresolved pass-family projection includes the semantic obligation, its
continuation action, and the last exact runtime job identity when one exists.
Those fields form one current-work identity. Body Modeling no longer stores
`bodyModelingAction` beside a launch-only work value. Its one
`EpiphanyBodyModelingCurrentWorkProjection` remains visible through Launch,
Wait, and Review and binds the latest job. A failed or cancelled attempt
therefore changes the projection digest and permits one fresh Resident Self
pressure/grant; replaying the unchanged failed state remains idempotent. No
retry counter, timestamp comparison, coordinator receipt, or event acquires
scheduling authority.
Each simple unresolved model-pass family embeds one
`EpiphanyAgentPassAttemptProjection`: continuation action plus the exact latest
runtime job identity when one exists. Body, proposal and frontier-verdict
Modeling, Verification, consideration, admitted-direction consideration, and
Reorientation use that shared shape. Research and the two-stage Planning
workflow retain their full exact lifecycle projections because they carry more
than one pass stage; current-work may not crush them to an action or stage enum.
The semantic obligation and exact attempt/lifecycle together form current-work
identity. A failed or cancelled attempt therefore changes the projection digest
and permits one fresh Resident Self pressure/grant; replaying unchanged failed
state remains idempotent. Proposal attempt ordinals are canonical and
contiguous, and all older attempts must be terminal. No retry counter,
timestamp comparison, coordinator receipt, or event acquires scheduling
authority.
## Runtime and attempt lifecycle
@ -314,10 +319,10 @@ same durable records before and after archival.
## Verification and open gates
Accepted through the local `d48f69b7` source boundary:
Accepted through the local `9b9b5c85` source boundary:
- every Epiphany core target compiles;
- core library `496/496`;
- core library `491/491`;
- OpenAI runtime library `25/25`;
- model-runtime binary `10/10`;
- OpenAI-runtime binary `10/10`.
@ -329,9 +334,10 @@ Accepted through the local `d48f69b7` source boundary:
external observation or model call, and preserves the exact three-stage
decision chain;
- reopened current-work projection is identical and byte-for-byte read-only at
Launch, Wait, Review, completed, and post-Research boundaries; a failed Body
attempt changes exact identity, receives one fresh grant, and identical
failure replay cannot mint another pressure.
Launch, Wait, Review, completed, and post-Research boundaries; failed Body
and proposal attempts change exact identity, receive one fresh grant, and
identical failure replay cannot mint another pressure. Proposal retry then
advances to the canonical next attempt.
- `epiphany-model-runtime audit-decision` reconstructs an exact terminal pass
from typed durable records only; the query is byte-for-byte read-only and
remains complete after live worker result retirement.
@ -343,11 +349,11 @@ Accepted through the local `d48f69b7` source boundary:
preserving the native request as the only canonical request. Exact
`c1a6034f` keeps read-only physiology alive under the brake; exact `6b44b4d3`
emits Idunn's shared signed-health schema.
- exact source `470d4cb5b46f94a5490a479dba19604828e1b5d1` passed Idunn's native serialized
- exact source `d2ca66301fb6af4e7d2d27fff0b772b0f0fccdf4` passed Idunn's native serialized
Yggdrasil workspace gate under test receipt SHA-256
`c6594f0a857c77ca3280864231930fa62c928f76cb807c89f321fde21ed14b66`
`de0fc6b360ce03493b13208d917dc8349801f03364617d966152c85846c47482`
and is deployed as 26 binaries plus witness in release
`sha256-ce4a287ebb915ff9410dd04e022285d82998e0bf4c9acb3b04a44db661aea90c`.
`sha256-46407552b4a0937f63d2b7f2bd09a1dacb89d671a6e3807c97209159541aef06`.
- the supervisor, heartbeat, and Resident Self units are active with zero
restarts, the body is authenticated-health admitted by Idunn, and the swarm
and deployment brakes are engaged.
@ -356,13 +362,13 @@ Accepted through the local `d48f69b7` source boundary:
Open before Model Atlas Gate 1 resumes:
1. deploy exact build-affecting source `d48f69b7` through Idunn's native
1. deploy exact build-affecting source `9b9b5c85` through Idunn's native
compile/test/package path, verify signed health, and restore the deployment
brake after the transaction;
2. run the fresh exact-package capstone over a new store with OpenRouter
`stealth/ox-alpha`, concurrent Persona and repository work, Body direct to
Modeling without Eyes, Hands through Verification, exact context audit,
and restart/re-entry;
2. publish that exact witness into the frozen private Ox12 local Verse and
resume its typed state; stop after three provider failures total, and prove
proposal retry, Hands through Verification, exact context audit, and
restart/re-entry without public speech;
3. only then restart Model Atlas Gate 1 from a new
external root.
@ -376,6 +382,16 @@ identity, so Resident Self saw no new pressure under the old schema. The run is
braked, all transient units are inactive, and it must not be resumed or used
as accepted capstone state.
Ox12 is frozen evidence under
`/var/lib/gamecult/epiphany/capstones/ox12-84a7dec1`. Exact `d2ca6630`
successfully recovered an orphaned worker, ran direct Body Modeling without
Eyes, admitted the Body decision, and completed admitted-direction Imagination.
Proposal Modeling then sealed a typed failure when OpenRouter returned neither
text nor tool calls. The unresolved request remained launchable, but its
terminal attempt identity was discarded and the Resident pressure aliased the
already-consumed pre-attempt projection. Exact `9b9b5c85` is the source repair;
Ox12 remains inactive until that exact package is admitted.
Historical c011 and partial Gate roots remain read-only. The pre-upgrade
Yggdrasil's old capacity/topology is obsolete; the upgraded 16-vCPU host is the
intended swarm and CI/CD body. Idunn owns the installed Epiphany source-change