Delete fixture-aggregated MVP gate

This commit is contained in:
Meta Vens 2026-07-12 22:59:53 +01:00
commit d055938e29
8 changed files with 26 additions and 818 deletions

View file

@ -306,3 +306,16 @@ and both aggregate green gates are deleted. The readiness report remains sight
only, and `repo.readiness_review_request` remains the correct request cargo.
Typed review schemas/readers may ingest a future provider-authored result; four
labels supplied by one caller are not four reviews.
## Fixture aggregation as MVP readiness
After the counterfeit Idunn, Bifrost accounting, and readiness-review inputs
were removed, `epiphany-repo-swarm-mvp-gate-smoke` still read two prior smoke
summaries, built local Weksa/memory fixtures, manually emitted eleven green
rows, and hard-coded `demoReady=true`. It did not execute one live end-to-end
organism or verify the external consequences named by several rows.
The aggregate gate binary, wrapper mode, summary-path inputs, build target, and
display projection are deleted. Focused contract tests remain useful, and live
fire remains the proper whole-path evidence layer. A pile of green fixture
summaries is not a system readiness owner.

View file

@ -52,6 +52,7 @@
- Idunn deployment and aftercare outcomes have no local production writer. The synthetic deployment-config family smoke and its green aggregate MVP-gate handoff are deleted; config audit/runbook remain pre-deployment surfaces, while typed Idunn readers await genuine daemon-authored ingest.
- Bifrost artifact-acceptance and metrics requests remain open until actual Bifrost/Maintainer receipts are ingested. The stale response-closing request-family smokes, accounting bundle, wrapper mode, and aggregate green gate are deleted.
- Repo-work readiness reports are sight only. The generic readiness-review approval command and writer are deleted because one caller supplied four unresolved reviewer labels; `repo.readiness_review_request` is the remaining request path, and typed review readers await genuine multi-organ/provider evidence.
- There is no aggregate repo-swarm MVP gate. The former smoke manually aggregated fixture summaries into green rows and `demoReady=true`; it and its wrapper are deleted. Whole-organism readiness requires a live-fire path whose claimed consequences are observed at their owning boundaries.
- Persona owner: `collaboration-feedback` writes public, bounded feedback only after that provider receipt exists.
- Imagination owner: consensus participant selection, packet reference, receipt status/id, and adoption gate.
- Persona output: `pending-imagination` with null consensus fields and `responseOwner=Imagination`.

View file

@ -70,6 +70,9 @@ The confirmed conceptual substitutions have been cut:
- generic repo-work readiness approval is deleted. The former command accepted
four arbitrary strings as Maintainer/Soul/Mind/Bifrost reviews; readiness
remains sight-only and the request family awaits genuine reviewer evidence.
- the aggregate repo-swarm MVP gate and wrapper are deleted. It painted green
rows from prior smoke summaries and local fixtures rather than exercising one
live end-to-end organism. Use focused tests plus live-fire evidence instead.
The presentation boundary is now plain: `swarm overview` is a generic compact read-only projection. Gjallar is a downstream TUI application on Nightwing and is not an Epiphany organ, provider, owner, runtime, or architectural dependency. Eve/CultUI graphs may be lowered or composited downstream without Epiphany caring which presentation client does it.

View file

@ -28,6 +28,10 @@ Inventory every production call to `write_*receipt`, then ask whether the execut
and authored approval itself; its smoke, wrapper, and aggregate green gates
are also deleted. Use the readiness-review request family until genuine
reviewer evidence is resolved and ingested.
- Aggregate repo-swarm MVP gate: deleted. After its provider-response inputs
were removed it still manually painted green rows and hard-coded
`demoReady=true` from prior smoke summaries and local fixtures; it was not a
live end-to-end verifier.
- `epiphany-operator-run`: owner-aligned for operator-run receipts and coordinator receipts derived from the run it executes.
- smoke binaries and the `epiphany-verse-query smoke` arm: fixtures, not runtime evidence. They remain a quarantine risk if permitted to target canonical stores.
- `epiphany-work` Weksa lowering: a lowering projection receipt, explicitly non-publication authority; no substitution confirmed in this pass.