From c6857e48d98c91ae21a6328b10da0a0bdd2bfca0 Mon Sep 17 00:00:00 2001 From: Meta Vens Date: Sun, 16 Aug 2026 20:10:48 +0200 Subject: [PATCH] Align campaign plan with Model Atlas gate --- notes/epiphany-fork-implementation-plan.md | 29 ++++++++++++++++------ 1 file changed, 21 insertions(+), 8 deletions(-) diff --git a/notes/epiphany-fork-implementation-plan.md b/notes/epiphany-fork-implementation-plan.md index 13d3a875..c09a5b5f 100644 --- a/notes/epiphany-fork-implementation-plan.md +++ b/notes/epiphany-fork-implementation-plan.md @@ -204,11 +204,24 @@ Delete or demote: ## Immediate Next Action -Keep the live shakedown paused and consolidate current-work lifecycle ownership. -Research now has one typed Launch/Review owner shared by Resident Self, -coordinator policy, and status. Map Modeling and Verification's exact causal -currency and give each the same single-owner shape without erasing their -distinct prerequisites or creating a generic registry. Delete any stale role -projection that can still suppress, fork, or repair current work. Replay the -accepted organ circuits, then run the fresh-repository source -> Hands -> Soul --> Modeling -> Mind -> Self capstone. +Keep the five-day shakedown paused and execute Model Atlas Gate 1 on Starfire. +Use separate Epiphany, Odin, and Eve repository identities and fresh local +Mind, private identity, publisher, catalog, projector, ingress, and resident +stores. Keep impact ingress absent while ordinary Modeling admits the three +local seed facts and the publishers plus projector establish signed +publications, exact watermarks, rejection telemetry, and the canonical retained +Eve tree. Ordering is part of the invariant: a brake cannot forbid the first +publication and also prove that signed sight exists. + +After sight is established, engage `atlas.publish`, `atlas.project`, and +`atlas.impact_ingress`. Run one more publisher and projector cycle plus the +first ingress cycle. Prove that all three owners report held work, no local +Modeling or Soul pressure is scheduled, no Atlas state advances, and the last +Eve projection remains available as visibly stale, read-only state. + +Do not release autonomous scheduling, register topology in `gamecult-ops`, +touch Yggdrasil, reuse the historical c011 volumes, or treat isolated tests as +the operational proof. If Gate 1 passes, Gate 2 may release only the Atlas +Modeling/Soul wake scopes for a temporary Eve contract change while preserving +the existing Hands gate. Daemon supervision, sustained physiology, and +operational registration remain later gates.