Bind Imagination plans to frontier scope
This commit is contained in:
parent
182a591369
commit
88778762d6
6 changed files with 59 additions and 6 deletions
|
|
@ -756,7 +756,12 @@ pub fn epiphany_frontier_planning_output_schema() -> serde_json::Value {
|
|||
"model_hash": {"type": "string", "minLength": 1},
|
||||
"frontier_item_id": {"type": "string", "minLength": 1},
|
||||
"frontier_item_hash": {"type": "string", "minLength": 1},
|
||||
"safe_paths": {"type": "array", "minItems": 1, "items": {"type": "string", "minLength": 1}},
|
||||
"safe_paths": {
|
||||
"type": "array",
|
||||
"minItems": 1,
|
||||
"description": "A strict lexicographically sorted, duplicate-free narrowing of the immutable planning context source_scope. Every path must equal one source_scope entry or be a descendant of one; never add an adjacent or otherwise unscoped path.",
|
||||
"items": {"type": "string", "minLength": 1}
|
||||
},
|
||||
"action": {"type": "string", "minLength": 1},
|
||||
"command": {"type": "string", "minLength": 1},
|
||||
"checks": {"type": "array", "minItems": 1, "items": {"type": "string", "minLength": 1}},
|
||||
|
|
@ -1721,6 +1726,12 @@ mod tests {
|
|||
assert!(schema["properties"].get("statePatch").is_none());
|
||||
assert!(schema["properties"].get("selfPatch").is_none());
|
||||
assert!(schema["properties"].get("repoModelPatch").is_none());
|
||||
assert!(
|
||||
schema["properties"]["frontierPlanCandidate"]["properties"]["safe_paths"]
|
||||
["description"]
|
||||
.as_str()
|
||||
.is_some_and(|description| description.contains("never add an adjacent"))
|
||||
);
|
||||
assert_eq!(schema["additionalProperties"], false);
|
||||
}
|
||||
|
||||
|
|
|
|||
|
|
@ -1377,7 +1377,7 @@ fn worker_output_contract_text(document: &EpiphanyWorkerLaunchDocument) -> &'sta
|
|||
EpiphanyWorkerLaunchDocument::Role(document)
|
||||
if document.frontier_planning_context.is_some() =>
|
||||
{
|
||||
"Required frontier-planning result fields: roleId, verdict, summary, nextSafeMove, filesInspected, frontierPlanningRequestId, frontierPlanCandidate. Echo the exact request and candidate identity from the typed launch context. Do not emit statePatch, selfPatch, or repoModelPatch."
|
||||
"Required frontier-planning result fields: roleId, verdict, summary, nextSafeMove, filesInspected, frontierPlanningRequestId, frontierPlanCandidate. Echo the exact request and candidate identity from the typed launch context. frontierPlanCandidate.safe_paths may narrow but must never expand the immutable source_scope: every safe path must exactly equal a source_scope entry or be a descendant of one, in strict lexicographic order without duplicates. Do not include adjacent files merely because the plan would benefit from them; identify them as a stop condition instead. Do not emit statePatch, selfPatch, or repoModelPatch."
|
||||
}
|
||||
EpiphanyWorkerLaunchDocument::Role(document)
|
||||
if document
|
||||
|
|
|
|||
|
|
@ -1400,6 +1400,17 @@ mutation of the old launch receipt.
|
|||
failed attempts cannot later supply a candidate or override the successful
|
||||
attempt.
|
||||
|
||||
Live v50 exposed a missing-context fault at the Imagination boundary. Runtime
|
||||
spine already enforces that every candidate `safe_paths` entry equals an
|
||||
immutable planning `source_scope` entry or descends from one. The model-facing
|
||||
schema described only a non-empty string array, and the runtime output contract
|
||||
asked for identity echo without stating the ceiling. Two consecutive canonical
|
||||
Imagination attempts therefore expanded scope and failed closed with no
|
||||
candidate cargo. The repair belongs at context ownership: the schema and
|
||||
runtime contract now state that safe paths are a sorted, duplicate-free
|
||||
narrowing of source scope, and adjacent useful files belong in stop conditions.
|
||||
The validator remains unchanged and Mind retains final admission authority.
|
||||
|
||||
## Exact release build cache ownership
|
||||
|
||||
The root release-bundle manifest owns release profile policy. Measured on the
|
||||
|
|
|
|||
|
|
@ -211,3 +211,34 @@ worktrees. The evidence write caught the damage immediately. Both were restored
|
|||
with `git submodule update --init --checkout` to pinned SHAs `7676a4c2` and
|
||||
`fab5b31d`, and `git submodule status` is clean. Do not reuse junctioned live
|
||||
submodule targets for future baseline archives.
|
||||
|
||||
Exact relinquishment commit `182a591369131d621461947723e7fb71637fa386`
|
||||
is pushed and packaged as
|
||||
`sha256-b194a1850071739d62f1dd820529a511d2e7d07286d451506f1021e05e796143`
|
||||
with witness
|
||||
`sha256-455e715919444c98528986ee3a88aeb6daffd187d57d5202a15d7e9e688c1979`.
|
||||
Sealed v50 at
|
||||
`F:\Projects\.epiphany-runtime\shakedown\live-20260808-v50-hands-relinquishment`
|
||||
proved `record-refusal`, atomic frontier retirement, native
|
||||
`frontierRelinquishment`, and structural invalidation of the historical v49
|
||||
route. Corrected proposal Modeling eventually admitted RepoModel revision 4
|
||||
after two invalid patches were rejected and a transient provider HTTP 503 was
|
||||
recorded as typed failure
|
||||
`role-failure-review-497e06aa-663d-4b1d-b55f-1e46629f6227`.
|
||||
|
||||
The resulting planning request
|
||||
`repo-frontier-planning-d3f0f49859819409fcc7453c33039feee0a3c29f636c4b216ef241a98d5bdce4`
|
||||
correctly targeted eight source owners. Both canonical Imagination attempts
|
||||
failed closed with `frontier planning candidate exceeds exact frontier
|
||||
authority`; receipts are
|
||||
`frontier-planning-failure-review-1fff4758-7f85-4800-9dda-4f0bcc35ccf6`
|
||||
and worker result `result-worker-030c6e8e-50b9-482c-9c28-613a0360bbe9`.
|
||||
Source diagnosis found the validator correct but the model context incomplete:
|
||||
neither `epiphany_frontier_planning_output_schema` nor the OpenAI runtime output
|
||||
contract said that `safe_paths` must equal or descend from immutable
|
||||
`source_scope`. A local focused repair states that invariant and tells
|
||||
Imagination to put useful adjacent paths in stop conditions instead of silently
|
||||
expanding authority. Focused core and OpenAI-runtime tests pass. Commit and
|
||||
push, package once, clone v50 into a fresh runtime, and replay a fresh proposal
|
||||
through Modeling, canonical Imagination, and dedicated Mind. Do not retry the
|
||||
consumed v50 request again.
|
||||
|
|
|
|||
Binary file not shown.
|
|
@ -34,9 +34,9 @@ invariants:
|
|||
- Evidence and git retain history; this map retains only state that changes future decisions.
|
||||
|
||||
current_status:
|
||||
summary: Epiphany is a supervised engineering alpha on Starfire, not deployment-ready. Exact a6c23872 packages as sha256-5605ff00ffea1fce8f679868ae1081215707ef881cc5795172385aae27f96f0c with witness sha256-d9ed1d70a3e1db42b23761991a961f8e9c60531bd480ba01db7e8669a8bfd0e2. v46/v47 remain sealed negative evidence. Fresh route-free v49 proves proposal Modeling, canonical Imagination, dedicated Mind adoption, terminal planning lifecycle, and exact Hands gate without overrides. The historical v49 route remains immutable and cannot authorize the new relinquishment implementation. A labeled supervisor pass now gives Hands a typed refusal and Mind one atomic route-retirement admission; focused tests prove replay, collision, insufficient-gap, old-authority, and existing-consequence negatives. Persona consequence, retention, endurance, and Linux/Yggdrasil cognition remain open.
|
||||
summary: Epiphany is a supervised engineering alpha on Starfire, not deployment-ready. Exact 182a5913 packages as sha256-b194a1850071739d62f1dd820529a511d2e7d07286d451506f1021e05e796143 with witness sha256-455e715919444c98528986ee3a88aeb6daffd187d57d5202a15d7e9e688c1979. Sealed v50 proves the typed Hands refusal and atomic Mind relinquishment against the historical v49 route, then proves corrected proposal-bound Modeling through RepoModel revision 4. Its canonical Imagination attempts both failed closed because the model-facing planning contract omitted the enforced safe-path ceiling; no candidate or Hands authority was admitted. A focused local repair now states that invariant in both schema and runtime output contract. Persona consequence, retention, endurance, and Linux/Yggdrasil cognition remain open.
|
||||
operational_state:
|
||||
local_worktree: supervisor_relinquishment_implemented_verification_and_commit_next
|
||||
local_worktree: imagination_safe_path_context_fix_verified_commit_next
|
||||
operator_wireguard: restored
|
||||
yggdrasil: canonical_small_public_crossing_body
|
||||
starfire: temporary_epiphany_cognition_body
|
||||
|
|
@ -52,8 +52,8 @@ current_status:
|
|||
bifrost_feedback_crossing: authenticated_transport_only
|
||||
yggdrasil_epiphany_services: absent
|
||||
resident_physiology: heartbeat_and_self_running
|
||||
unresolved_authority: The supervisor implementation is local and verified but not yet committed, pushed, packaged, or exercised against a live coordinator-created route. The broad 645-test library run passed 642 with one ignored. Its two failures (`autonomous_direction_option_is_atomically_bound_and_selected_for_modeling` and `repo_frontier_route_refuses_unadmitted_and_ineligible_models`) reproduce unchanged against isolated pushed HEAD d1d9cd10, so they are pre-existing suite corrosion rather than relinquishment regressions. Focused relinquishment, Hands CLI, status, and state-model checks pass.
|
||||
next_action: Commit and push the completed supervisor relinquishment pass with the isolated d1d9cd10 baseline comparison as its failure receipt. Package the exact source once, exercise `record-refusal` against a fresh incomplete coordinator route, prove native status and the retired model authority in-process, then replan and continue CRRC, accepted Reorientation, Continuity recovery, and Soul closure.
|
||||
unresolved_authority: v50 consumed both immutable Imagination attempts under the old release after producing the same bounded rejection, `frontier planning candidate exceeds exact frontier authority`. Source inspection shows the validator already owns the correct ceiling, but neither the output schema nor the runtime contract told Imagination that safe_paths must equal or descend from source_scope. The local context repair is focused-test green but is not yet committed, pushed, packaged, or replayed on a fresh runtime.
|
||||
next_action: Commit and push the Imagination safe-path context repair, package its exact source once, clone sealed v50 into a fresh runtime, issue a fresh typed proposal, and prove Modeling -> Imagination -> dedicated Mind adoption without overrides. Record the transient v4 HTTP 503 and both v50 authority failures as endurance and context receipts. Then continue the adopted CRRC/Reorientation/Continuity/Soul implementation route.
|
||||
|
||||
active_subgoals:
|
||||
- Prove Persona, Self, Eyes, Modeling, Imagination, Hands, Soul, Mind, Continuity, and nervous-system behavior individually.
|
||||
|
|
|
|||
Reference in a new issue