Record dormant authority deletion

This commit is contained in:
Meta Vens 2026-08-17 22:24:11 +02:00
commit 6dab234769
5 changed files with 34 additions and 16 deletions

View file

@ -4991,12 +4991,23 @@ validity, mutation shape, or admission; those remain with the concrete Body and
Proposal families. The shared vocabulary is therefore DRY without becoming a
generic work registry.
The next source audit found that claim-repair is not a live request family.
The next source audit found that claim-repair was not a live request family.
`commit_repo_model_claim_challenge` and
`commit_repo_model_claim_repair_request` have no production caller, no source
constructs a `RepoModelClaimChallenge`, and no acceptance test proves the chain.
Its aggregate-thread launch branch is dormant scaffolding. The deletion line is
the repair request/binding/context/export and their carrier fields; a future
Eyes contradiction must earn a new typed external-evidence obligation through a
real producer, current-work projection, terminal context, and Mind admission
proof rather than inheriting this unowned anatomy.
Its aggregate-thread launch branch was dormant scaffolding. Exact `20dd66c8`
deletes the repair request/binding/context contracts, runtime registration and
carriers, coordinator validation/binding writer, reasoning projection, result
cargo, exports, and OpenAI lowering. A source guard over Rust/TOML paths finds no
surviving family symbol. The Eyes claim-challenge document remains because its
exact claim hash independently suppresses unsafe planning. A future Eyes
contradiction must earn a typed external-evidence obligation through a real
producer, current-work projection, terminal context, and Mind admission proof.
That deletion pass also falsified the initial launch-CAS proof. Body and
Proposal launchers first projected work, then opened a second cache snapshot;
the latter could observe a just-committed binding, increment the attempt
ordinal, and launch a second live worker. The owner now derives launchability
and ordinal from the same pulled cache snapshot used to construct its exact CAS.
Concurrent Proposal launch convergence passes 20/20 stress iterations; a live
attempt cannot be converted into retry authority by a convenience preflight.