Project current service lifecycle state

This commit is contained in:
Meta Vens 2026-07-13 00:15:06 +01:00
commit 5e7ec8e874
5 changed files with 76 additions and 19 deletions

View file

@ -490,3 +490,14 @@ and its smoke manufactured that verdict. The requirement is now
`cluster-windows-service-audit: complete`, emitted by actual SCM enumeration.
The negative smoke corrupts that observed audit and proves the execution audit
becomes incomplete; a copied prior conclusion has no authority.
## Historical failure presented as current lifecycle state
The service lifecycle directory selected the newest attention-worthy receipt
before considering the actual newest receipt. Because lifecycle receipts have
no resolution relation, an old failure remained the displayed present forever
after a newer successful reconcile. The reducer now selects the latest event
for each service family; attention is derived from that event. History retains
older failures without letting them impersonate current state. Adversarial
tests prove a newer recovery supersedes an old failure and a newer failure is
not hidden by an old recovery.

View file

@ -125,6 +125,9 @@ The confirmed conceptual substitutions have been cut:
`installed`. Single-service completion requires SCM status/reconcile; cluster
completion requires the observed cluster service audit and cannot cite an
earlier copy of its own execution-audit verdict.
- Service lifecycle projection selects the actual latest family event. An old
attention receipt no longer masquerades as current state after recovery;
newer failures still surface immediately.
The presentation boundary is now plain: `swarm overview` is a generic compact read-only projection. Gjallar is a downstream TUI application on Nightwing and is not an Epiphany organ, provider, owner, runtime, or architectural dependency. Eve/CultUI graphs may be lowered or composited downstream without Epiphany caring which presentation client does it.