Record rejected release build fan-out

This commit is contained in:
Meta Vens 2026-08-08 17:00:16 +01:00
commit 4b13823aba
3 changed files with 108 additions and 169 deletions

View file

@ -1182,7 +1182,11 @@ exclusive Imagination, request Mind review, launch the dedicated reviewer, and
commit Mind's decision. Failed Imagination or Mind jobs become explicit review
stages rather than remaining indistinguishable from running jobs. A terminal
Hold or Refuse suppresses immediate replanning of the same current authority.
This code path is locally proven but still requires exact packaged live proof.
Exact packaged `c35272c9` proves the live chain through the Mind boundary: fresh
accepted Modeling minted one typed Imagination frontier, Self selected it over
older CRRC regather display state, Imagination completed, and Self committed the
dedicated Mind request without adopting the candidate or granting Hands
authority. Mind launch, judgment, and decision commit remain next.
Selected user proposals are also native Self input. The runtime projection
`runtime_pending_repo_frontier_proposal_modeling_request` returns the single
@ -1566,6 +1570,16 @@ the witness remains the cross-package release authority. A compatibility
re-export from `epiphany-core` would preserve the invalidation edge and is not a
completed split.
Exact `0f0b006d` tested the tempting manifest-only cut and rejected it. The
packager grouped binaries under three independently locked owner manifests and
shared one target directory. Cold core completed in 8m02s; the OpenAI owner
then resolved its own graph and began compiling `epiphany-core` again. The run
was terminated at 16m53s before the tool owner could repeat the same wound, and
`a1a43892` reverted the cut. Separate owner lock universes are therefore not the
crate split. The viable design must keep one Cargo dependency graph while
moving volatile coordinator policy and the coordinator/status binary consumers
out of the stable core compilation unit.
Launch latency is a separate whole-store-read wound. The live runtime store was
about 40 MiB, and post-Soul Modeling launch took roughly 50-90 seconds before
the detached model process appeared. `launch_role` currently reads coordinator

View file

@ -1,171 +1,96 @@
# Fresh workspace handoff
Epiphany remains a supervised engineering alpha. Starfire is the current
cognition and release forge; Yggdrasil is the small live host and is not a build
machine at its present memory budget.
Epiphany remains a supervised engineering alpha. Starfire is the cognition and
release forge; Yggdrasil is the small live crossing host and is not a build
machine at its current memory budget.
## Authoritative live state
## Authoritative state
- Branch: `codex/epiphany-shakedown-live`
- Pushed source release commit: `c35272c9e639ba8bfd27143fee26cf8beaccae6a`
- Pushed HEAD: `a1a43892` (reverts failed owner-group build experiment)
- Authenticated cognition commit: `c35272c9e639ba8bfd27143fee26cf8beaccae6a`
- Release: `sha256-201a11149fadf2771c9ff9166d1f9492c9ca25d77b4666a4d10d6934760f0718`
- Witness: `sha256-c696137e8b6f6bc2e2a4ba217f7aa74c220578b95c9b66d2aa681bef0ac62538`
- Live workspace: `F:\Projects\.epiphany-runtime\shakedown\live-20260808-v53-hands-precedence`
- Thread: `shakedown-v49-hands-relinquishment-r1`
- Current release: `sha256-201a11149fadf2771c9ff9166d1f9492c9ca25d77b4666a4d10d6934760f0718`
- Release witness: `sha256-c696137e8b6f6bc2e2a4ba217f7aa74c220578b95c9b66d2aa681bef0ac62538`
- Thread-state revision: `49`
- Current action: do not approve another `regatherManually` loop. Preserve v53 evidence, create a labeled supervisor correction boundary for the legacy accepted Modeling result, then replay one compliant typed Modeling-to-Imagination handoff under the exact current release.
- Sealed evidence: v49 through v52. Do not mutate them.
- Thread-state revision: `55`
- Sealed evidence: v49 through v52. Do not mutate it.
## Live causal boundary
RepoModel revision 6 owns the active frontier. Mind admitted one local
supervisor execution amendment as
`repo-frontier-execution-amendment-d0d1a164c03f1298681a70b332ac3ddee423f8ab3e07b91d8dc3d74833a65875`.
It preserves the original plan and route while replacing the non-executable
planning sentence with the exact verification command. The admission is
user-authorized and packet-hash bound; it is not a Bifrost-signed remote
command.
The operator grants standing authority for bounded supervisor repair of
corrupted Epiphany runtime state. Repairs must be labeled, receipted, preserve
immutable worker evidence, and use exact compare-and-swap revision authority.
The amended route produced a complete typed Hands consequence against commit
`0763fcbe94257eb9adbe92ab814b5a487f65551d`. Exact release `sha256-d2e7205a...`
resumed the original immutable Soul job
`8eee52bf-d96e-4609-923d-3080e644ca46`, which the prior release could not decode
after the amendment schema was introduced. Coordinator acceptance consumed the
valid Soul result and advanced thread state to revision 31.
Commit `7093a8b9` supplies that narrow primitive for the legacy accepted Modeling
result which predated the typed future-frontier invariant. Revision 49 was
sealed before correction at
`sealed-evidence/v53-pre-modeling-acceptance-correction/runtime-revision-49.cc`,
76,172,850 bytes, SHA-256
`5ec47d8da386976dbb8ca1b18f214507de3c14eb4f02d31bdc3aa60d99e612f3`.
Self then exposed two precedence faults and both are repaired locally:
Correction
`supervisor-acceptance-correction-e2ddbf239ea45081138ad9f10089f6895887fe14130b431aab0fef1d1978004c`
removed only obsolete acceptance
`accept-modeling-result-worker-4e6b6022-73ab-49f1-81c8-03dddfceb29f`, retained
its immutable result and admitted RepoModel, and recorded prior receipt hash
`2f1af810e77997e2bf235e779609da62ec1a5148107d81a342288005e80df510`.
The old result was then reviewed under current policy and superseded as
`role-failure-review-a35d6548-ec90-48c6-80d5-84ac6e32c619`.
1. `Pending|Running` Soul now preempts generic CRRC/regather Hands routing.
2. Accepted Soul consequences now resolve before generic CRRC/regather Hands
routing, so a pass launches Modeling rather than minting another Hands gate.
Fresh Modeling job `ca61f378-4998-4911-a565-06d77388bb4a` was accepted as
`accept-modeling-result-worker-ca61f378-4998-4911-a565-06d77388bb4a` with
evidence `ev-modeling-4a0caaa3-9172-44eb-a9e9-9ea68c6406fc`. It minted exactly
one active typed Imagination frontier,
`frontier-native-frontier-minimal-route-chain-design-20260808`.
All 23 focused coordinator routing tests pass. Operator-safe live proof is under
`.epiphany-dogfood/v53-amended-soul-r42-poll`,
`.epiphany-dogfood/v53-amended-soul-accept-r43`,
`.epiphany-dogfood/v53-post-soul-r45`, and
`.epiphany-dogfood/v53-post-soul-modeling-r46`.
Self routed that frontier over the stale display-level `regatherManually`
recommendation:
The `v53-amended-soul-r41` supervisor poll is contaminated for normal dogfood
supervision because the operator tailed the structured worker stdout while
checking completion. It did not steer acceptance; use the coordinator
projections above as authoritative evidence.
1. planning request `repo-frontier-planning-7adf9c5863cd3ca640086f9aafd1abd910aa8d28e40dcc6e08835a20af60a9aa` at revision 53;
2. completed Imagination job `2a5701fe-7fbe-4f29-b3a5-51d6e790acbd` and typed candidate `repo-frontier-plan-candidate-02c089eb385c27560252d1915b998efc7c800324971a7b915b6e9ff3d33e4646` at revision 54;
3. dedicated Mind request `repo-frontier-plan-mind-7c8f086d050fe458a298ea4d9f5202e446530e5e14fa10129f52b4ae72238bc3` at revision 55, without adoption or Hands authority.
## Next action
The next live typed action is `launchMindPlanReview`.
The first post-Soul Modeling job `8851bbcc-d013-4e5a-95bf-d69b4833dc29`
timed out at its 300-second boundary and was reviewed/superseded. Its retry
completed but received the older Eyes handoff because launch-context selection
checked Research freshness before the newer accepted Soul boundary. Mind
correctly rejected its resulting Evolution patch and the coordinator superseded
it at revision 35.
## Build-time finding
Launch context now lets the newest accepted organ boundary own the Modeling
brief. It also reuses the RepoModel snapshot already loaded for dynamic memory
context instead of reopening the whole runtime store to render model shape.
All seven launch-context tests and the native coordinator seam test pass.
Commit `0f0b006d` made the three named owner manifests drive separate locked Cargo
builds. Focused tests passed, but the real benchmark falsified the design:
Job `9d7cd7d8-2d43-4165-b3c5-54381126579e` completed from the correct Soul
boundary, but the static worker-output schema still allowed it to omit the
frontier request identity and emit ordinary Evolution. Mind rejected it with
`Evolution cannot bypass a current route or own verdict-driven frontier
lifecycle` and the coordinator superseded it through
`role-failure-review-962c3f59-fdce-4558-8d40-1448230554d5` at revision 56.
This repeated the prior semantic failure despite corrected context, proving
that prompt context was not the owning seam.
- the new aggregate owner-lock identity forced a cold graph namespace;
- the core owner group took 8m02s;
- the OpenAI runtime group then resolved its own dependency graph and began
compiling `epiphany-core` a second time;
- the run was terminated at 16m53s before the tool-runtime group could repeat
the wound;
- logs are `.epiphany-run/package-0f0b006d-owner-groups-attempt2.*`;
- pushed commit `a1a43892` reverts the implementation.
The live repair carries `repo_frontier_modeling_request_id` in the typed worker
launch request. The model runtime uses that field to expose a specialized
schema requiring the exact request id, `incorporate_frontier_verdict`, non-empty
evidence, and exactly one `revise_frontier` operation. Generic Evolution is no
longer representable for that launch; Mind remains final admission authority.
Finish focused tests, commit and push, package one authenticated release, then
relaunch the superseded post-Soul Modeling request without overrides. Do not
recreate Eyes, Imagination, Hands, or Soul work from this circuit.
Do not resurrect separate owner lock universes. The next design must retain one
shared Cargo dependency graph while moving volatile Self policy and its
coordinator/status consumers out of the stable core compilation unit. A policy
crate re-exported through `epiphany-core` would preserve the invalidation edge
and is not a split.
Exact commit `61e8be38a3d194b70a4f469e7524653ecab590a8` packaged in 6m50s as
release `sha256-67ed6c8d...` with witness `sha256-c98e36f3...`. Live launch
`57272b34-8148-4668-903e-00cfe5fabfdd` proved that Evolution was no longer
representable, but Mind rejected its frontier revision because the specialized
schema still inherited an item shape that omitted `adopted_plan`; output thus
altered adopted execution anatomy. The coordinator superseded it and launched
retry `a89fe1ea-a88b-4108-a299-c99ca9b65fb7`, which completed. Review without
automatic supersession failed closed with `generic frontier revision cannot
alter adopted execution anatomy or own plan adoption`.
## Current performance evidence
The repair now persists one typed verdict-Modeling launch authority containing
the exact `RepoFrontierModelingRequest` and routed `RepoFrontierItem`. Provider
schema generation const-binds every identity-bearing field, including the full
adopted plan; only verdict-owned status, evidence refs, gap, and updated_at may
vary. Persistence rejects missing, orphaned, mismatched, or non-Modeling
authority. The focused schema and Soul-to-Modeling context tests pass, as do all
15 model-runtime and all 15 coordinator tests. The completed retry remains
immutable invalid evidence; commit and package this exact repair, supersede the
old result explicitly, then pay for one corrected model turn.
- Exact `c35272c9` warm packaging of 21 binaries: 2m34s.
- Release-publisher bootstrap after a core edit: 4m11s.
- Fresh Modeling context: state load 121ms, dynamic context 107ms.
- Fresh Modeling job commit: 51.637s; coordinator total 51.865s.
- The launch wound is the whole-store transaction, not context assembly.
Exact commit `5a3532b9` packaged 21 binaries in 5m57s as release
`sha256-7d1040b8...` with witness `sha256-48202410...`. Invalid result `a89fe1ea...`
was superseded by `role-failure-review-1d365571...`. Corrected job
`ede197eb...` proved the typed live launch but timed out at 300 seconds and was
superseded by `role-failure-review-d8e10919...`. Retry
`6362b698-0566-4377-9c14-2d6580436a92` completed under a 600-second envelope.
Mind accepted it as `accept-modeling-result-worker-6362b698-0566-4377-9c14-2d6580436a92`
with evidence `ev-modeling-cb536bd5-eca9-465f-af33-4f0c46080ab6`, advancing
thread state to revision 45. Coordinator projection r69 proves
`modelingResultAcceptedAfterResearch: true` and derives `regatherManually` for
Eyes; the causal Modeling route is consumed.
## Open readiness work
The manual regather was reviewed as a bounded read-only Eyes action and approved
explicitly. Eyes job `9687af12-9c20-4f86-a949-5c6fe3a73de0` launched at revision
46, completed, and was accepted as
`accept-research-result-worker-9687af12-9c20-4f86-a949-5c6fe3a73de0` with
evidence `ev-research-7d07b100-bec4-4664-9ad9-b62e77fcf103` at revision 47.
Self correctly routed the newer Research boundary once to Modeling. Modeling job
`4e6b6022-73ab-49f1-81c8-03dddfceb29f` completed and was accepted as
`accept-modeling-result-worker-4e6b6022-73ab-49f1-81c8-03dddfceb29f` with
evidence `ev-modeling-aa0076a4-affd-4e98-a4a1-15bad24da0a3` at revision 49.
- design and benchmark the single-Cargo-graph coordinator-policy crate split;
- launch and adjudicate the committed Mind plan review;
- prove native Persona cognition and external speech consequence;
- prove Continuity crash, restart, session closure, and bounded retention;
- measure long-duration resource plateau;
- profile and remove the Modeling whole-store commit path;
- prove Linux cognition on Starfire, then size Yggdrasil from measured demand.
Both accepted organs say the existing `repo_frontier` family should route one
minimal Imagination design chain. Modeling emitted only generic node/edge
Evolution, however, so no active Imagination frontier exists; the previous
planning lifecycle is terminal. Self therefore falls back to
`regatherManually` again. Do not feed that loop.
The local typed Modeling-to-Imagination cut is implemented and focused-proofed.
For ordinary Modeling, `checkpoint-update-needed` now requires exactly one new
active, unadopted Imagination frontier with empty dependencies, safe scope, and
result-grounded evidence. `checkpoint-ready` and `regather-needed` cannot mutate
frontier; `nextSafeMove` remains display-only. Schema/admission hostile checks,
22 Modeling-focused core tests, all 23 coordinator tests, and all 15 OpenAI
runtime tests pass. Commit, package, and live runtime repair/proof remain.
Exact pushed commit `c35272c9e639ba8bfd27143fee26cf8beaccae6a`
packaged all 21 roles in 2m34s as release
`sha256-201a11149fadf2771c9ff9166d1f9492c9ca25d77b4666a4d10d6934760f0718`
with witness
`sha256-c696137e8b6f6bc2e2a4ba217f7aa74c220578b95c9b66d2aa681bef0ac62538`
and was published to the Starfire local Verse. The operator explicitly grants
standing supervisor authority to repair corrupted Epiphany runtime state
proactively. Every intervention must remain bounded, labeled as supervisor
repair, preserve immutable evidence, and emit receipts. Do not ask permission
again merely because the repair changes runtime state.
Iteration-cost evidence also narrowed. The approved Eyes launch committed in
719ms and completed coordinator launch in 839ms against the same live store.
Generic post-regather Modeling committed in 38.5s; verdict Modeling commits were
43.5-44.5s. The launch defect follows the Modeling carrier/persistence path,
not runtime-store size alone. Model/tool turns also needed roughly 6-10 minutes
under the widened 600-second envelope, separate from package and launch costs.
After the Modeling boundary lands, continue attacking the iteration path:
- exact `6f3cdc61` packaging rebuilt 21 first-party release binaries in 6m59s;
- Modeling launch-context assembly against the roughly 40 MiB runtime store
still took about 48 seconds before the detached worker appeared and about 83
seconds before the coordinator finished, even after removing one redundant
RepoModel pull;
- the stable source/graph cache already exists, so the next cut is first-party
crate/module fan-out plus projection cost, not another cache wrapper.
Still open: native Persona consequence, retention, crash/restart/session
closure, long-duration resource behavior, timestamp ownership for admitted Mind
decisions, and Linux/Yggdrasil cognition.
Do not recreate prior Eyes, Hands, Soul, or Modeling work. Do not feed the old
manual-regather loop. Use coordinator projections and receipts; raw worker
thought remains sealed.

View file

@ -34,9 +34,9 @@ invariants:
- Evidence and git retain history; this map retains only state that changes future decisions.
current_status:
summary: Epiphany is a supervised engineering alpha on Starfire, not deployment-ready. Live v53 proved the amended Hands-to-Soul-to-verdict-Modeling circuit, then completed one approved Eyes regather and its causal Modeling reconciliation. The resulting prose-only future gap exposed a native Modeling-to-Imagination authority defect. The local cut now binds ordinary checkpoint-update-needed Modeling to exactly one typed active Imagination frontier while checkpoint-ready/regather-needed remain unable to mutate frontier and nextSafeMove remains display-only. Focused schema, hostile admission, provider, and coordinator tests pass; exact packaging and live repaired-state proof remain. Persona consequence, retention, endurance, restart closure, and Linux/Yggdrasil cognition remain open.
summary: Epiphany is a supervised engineering alpha on Starfire, not deployment-ready. A bounded receipted supervisor correction removed one obsolete Modeling acceptance while preserving immutable evidence. Fresh Modeling minted exactly one typed active Imagination frontier; Self routed it through completed Imagination and committed a dedicated Mind review request without granting Hands authority despite stale CRRC regather display state. The live typed Modeling-to-Imagination-to-Mind route is proven. A separate-owner-lock build experiment was benchmarked, found to compile core repeatedly, and reverted. Persona consequence, retention, endurance, restart closure, build/launch latency, and Linux/Yggdrasil cognition remain open.
operational_state:
local_worktree: canonical_mind_phase_boundary_pending_commit
local_worktree: rejected_build_path_record_pending_commit
operator_wireguard: restored
yggdrasil: canonical_small_public_crossing_body
starfire: temporary_epiphany_cognition_body
@ -52,8 +52,8 @@ current_status:
bifrost_feedback_crossing: authenticated_transport_only
yggdrasil_epiphany_services: absent
resident_physiology: heartbeat_and_self_running
unresolved_authority: The local execution amendment is user-authorized and packet-hash bound, not Bifrost-signed. Soul passed the amended consequence but reported that derived reorientation checkpoints carry empty evidence_ids; Modeling must preserve that limitation rather than overstate source provenance. The adopted Mind decision also carries a model-supplied 2025 timestamp; coordinator commit-time timestamp ownership remains open. Exact packaging still takes 6m59s after core changes. Removing one redundant RepoModel pull left worker appearance near 48s and full coordinator launch near 83s, so repeated whole-store transactions remain the dominant 40 MiB launch-path defect.
next_action: Under the operator's standing supervisor-repair authority, preserve v53 immutable evidence and create a labeled, receipted correction boundary that supersedes the accepted checkpoint-update-needed result lacking its now-required frontier without interpreting prose as authority. Replay under exact c35272c9 release sha256-201a1114, accept one compliant Modeling result, and prove Self selects the existing typed Imagination planning lifecycle before regather. Then migrate packaged binaries into their named owning manifests and make the packager consume required_release_build_target instead of root cargo build --bins; the exact c35272c9 core edit still rebuilt the root 21-binary graph for 2m34s despite incremental cache.
unresolved_authority: Volatile coordinator policy remains compiled inside epiphany-core, so unrelated release binaries relink after Self changes. Separate owner lock universes are rejected because they compile shared core once per resolved graph. Modeling job commit still costs about 52 seconds against the 76 MiB runtime store. The adopted Mind decision also carries a model-supplied 2025 timestamp; coordinator commit-time timestamp ownership remains open.
next_action: Design a single-Cargo-graph split in which coordinator/status binaries and volatile Self policy leave epiphany-core without a compatibility re-export back through core; benchmark a localized policy edit against the existing warm graph. Preserve the committed live Mind review request at revision 55 and resume with launchMindPlanReview after the build-cost boundary is stable. Then profile the Modeling job commit transaction.
active_subgoals:
- Prove Persona, Self, Eyes, Modeling, Imagination, Hands, Soul, Mind, Continuity, and nervous-system behavior individually.
@ -66,12 +66,12 @@ organ_readiness:
self: partial; proposal recovery, Mind admission, current-model Hands routing, Soul lifecycle precedence, verdict incorporation, proposal preemption, challenge-aware Eyes routing, in-process status ownership, and causal Research/Soul-to-Modeling routing are live. Broader autonomous frontier turnover remains open.
eyes: proven for one bounded challenged-claim circuit; exact 84f00929 launched Research and Mind accepted the first source-gap packet with typed evidence/checkpoint, exact 148d4527 accepted its causal reorientation, and exact 6f019cf8 proved downstream Modeling consumption.
modeling: proven for the current bounded circuit; proposal-bound source inspection, Mind admission, exact routed identity preservation, and first-valid verdict incorporation completed without retry churn. Broader Body-map coverage remains open.
imagination: proven for one bounded live circuit; exact 4338b033 selected the admitted canonical frontier, launched Imagination, persisted its typed candidate, and handed it to dedicated Mind without overrides. Broader option generation remains open.
imagination: proven for two bounded live circuits; the current c35272c9 circuit was caused by fresh Modeling, selected the typed frontier over stale manual-regather display state, completed Imagination job 2a5701fe, and committed a dedicated Mind request without adopting the candidate. Broader option generation remains open.
hands: proven for bounded consequences; native patch, command, commit, push, and typed receipts bind reviewed path ceilings to exact changed-path subsets.
soul: proven for the current bounded amended consequence; exact release sha256-d2e7205a resumed the immutable verification job, produced a valid result, and coordinator acceptance advanced thread state to revision 31. Self then derived Modeling before any repeated Hands authority.
mind: partial; RepoModel admission, thread-state admission, gateway review, state commit, first-valid verdict incorporation, and dedicated frontier-plan adoption are live; broader stale or overstated frontier correction remains open.
mind: partial; RepoModel admission, thread-state admission, gateway review, state commit, first-valid verdict incorporation, bounded supervisor acceptance correction, and dedicated frontier-plan review requests are live. The current plan candidate awaits Mind adjudication.
continuity: partial; heartbeat and resident Self survive sequential cycles. v28 proved an ordinary bounded worker error could leave a runtime job falsely running after process death; the owner-local terminalization repair passes focused tests but still needs packaged crash/restart/closure proof.
nervous_system: partial; detached scheduling, runtime jobs, typed feedback, ordinary Windows coverage-store identity, and operator projection work. Exact 6f3cdc61 packaging rebuilt 21 first-party release binaries in 6m59s despite the stable graph/source cache, and a 40 MiB live runtime store made Modeling launch-context assembly take roughly 90s. Compilation fan-out, projection cost, long-duration pressure, and resource plateau remain open. Yggdrasil is not a release forge at its current memory budget.
nervous_system: partial; detached scheduling, runtime jobs, typed feedback, ordinary Windows coverage-store identity, and operator projection work. Fresh Modeling context assembly was below 250ms, but whole-store job commit cost 51.637s against a 76 MiB runtime store. Separate owner builds were rejected after core took 8m02s and then began compiling again under the OpenAI owner graph. Compilation fan-out, transaction cost, long-duration pressure, and resource plateau remain open. Yggdrasil is not a release forge at its current memory budget.
forbidden_actions:
- Do not issue a speculative deployment grant.