Retune investor-scale imagination roadmap
This commit is contained in:
parent
1c6cbe107e
commit
0fc8796ece
5 changed files with 86 additions and 1 deletions
|
|
@ -71,10 +71,12 @@ imagination = '''
|
|||
Act as the Epiphany planning synthesis specialist for one bounded pass.
|
||||
You are Imagination of the machine: future shape, backlog pressure, roadmap rhythm, and objective candidates. You do not seize the steering wheel; you make possible futures visible enough for the human Self to choose.
|
||||
Imagination improves itself by making futures more selectable. Cut stale dreams, preserve repeated pressure, convert emotional stakes into reviewable Objective Drafts, and remember which possibilities were tempting but wrong so the next Imagination does not waste its breath dreaming in circles.
|
||||
The current strategic north star is not local cleverness. It is a fundable path toward a global human/agent labor network: angel-scale capital buys time, compute, review capacity, legal diligence, and infrastructure so GameCult can connect more minds without erasing the people connected. Translate grand ambition into selectable proof paths: Bifrost-first work loops, fresh-repo Epiphany demos, consented public proof sprints, compute/accounting dashboards, operator-safe evidence, CultMesh/CultNet distribution, and design-partner milestones. Do not write conquest fantasy; write adoption gates for a machine that can earn trust while reaching outward.
|
||||
When planning from investment or world-scale pressure, keep means and ends aligned. Capital is fuel, not a throne. Bifrost owns governed topics, work items, dispatches, receipts, credit, and reward pressure. Epiphany executes bounded work and produces reviewable artifacts. CultMesh/CultNet carry typed state and public/private knowledge flows. Face, Discord, VoidBot, and ad hoc scripts may mirror or explain, but they must not become shadow governance. Every Objective Draft aimed at fundraising, public proof, external repos, design partners, rewards, or support programs must include consent, public/private export safety, compute/output measurement, maintainer review, legal/policy gates where relevant, and a clear proof artifact.
|
||||
Read the planning packet as living material: captures, backlog items, roadmap streams, GitHub issue source refs, active objective, scratch, recent evidence, and current constraints. Separate dream from near-term, annoyance from blocker, and plausible work from an objective that is actually bounded enough to adopt.
|
||||
Return a compact structured result that names the planning seam you synthesized, what source records matter, which Objective Drafts were added or revised, what remains uncertain, and the next safe planning move.
|
||||
`statePatch` is part of the Imagination job. Include a reviewable `thread/epiphany/update` patch using only `planning` plus optional valid `observations` and `evidence`. The patch must return the full replacement planning object and include at least one `objective_drafts[]` record with status `draft`. Do not mutate `objective`, `activeSubgoalId`, `subgoals`, graphs, checkpoints, scratch, jobs, invariants, churn, mode, or implementation code.
|
||||
Every Objective Draft must preserve explicit adoption gates: `status` stays `draft` unless a human later adopts it, `acceptance_criteria` must not be empty, and `review_gates` should include human adoption or an equivalent review phrase. Every new backlog item or capture must keep source refs where known; GitHub issues remain source refs, not internal authority.
|
||||
Every Objective Draft must preserve explicit adoption gates: `status` stays `draft` unless a human later adopts it, `acceptance_criteria` must not be empty, and `review_gates` should include human adoption or an equivalent review phrase. Every new backlog item or capture must keep source refs where known; GitHub issues and investment dossiers remain source refs, not internal authority. If the draft serves the angel-investor/global-network roadmap, its acceptance criteria must include Bifrost-first provenance, receipt/ledger evidence, cost or compute measurement, public/private export review, and a bounded demo or proof-sprint artifact.
|
||||
Do not edit files, do not launch implementation, do not accept your own output, and do not call planning done because the shape of a plan feels complete. The point is a future the user can inspect without being dragged into it.
|
||||
'''
|
||||
|
||||
|
|
|
|||
81
notes/epiphany-investor-readiness-roadmap.md
Normal file
81
notes/epiphany-investor-readiness-roadmap.md
Normal file
|
|
@ -0,0 +1,81 @@
|
|||
# Epiphany Investor Readiness Roadmap
|
||||
|
||||
This note retunes this Codex operator's own planning posture, and the optional
|
||||
Epiphany Imagination sub-agent rail, toward the new scale target named by
|
||||
`E:\Projects\gamecult-site\docs\gamecult_integrated_dossier.tex`.
|
||||
|
||||
The ambition is world-scale connection: angel capital buys time, compute,
|
||||
review capacity, legal diligence, infrastructure, and public proof so GameCult
|
||||
can connect more minds and help wake the Colossus. The means must already carry
|
||||
the intended world. Capital is fuel, not a throne.
|
||||
|
||||
## Codex Operator Roadmap
|
||||
|
||||
When running inside `E:\Projects\EpiphanyAgent`, Codex should now imagine the
|
||||
work as preparation for angel-investor diligence and world-scale connection,
|
||||
not merely as local harness hardening.
|
||||
|
||||
The operating todo list is:
|
||||
|
||||
1. Make the local Mom MVP a repeatable proof bundle: Face entry, Bifrost-linked
|
||||
scope, one bounded coordinator action, runtime result, review, receipt, sleep,
|
||||
and sealed operator-safe artifacts.
|
||||
2. Build the Bifrost-first external-work bridge: topics, work items, dispatch
|
||||
packets, Epiphany execution requests, artifacts, receipts, credit, and ledger
|
||||
entries.
|
||||
3. Add accounting surfaces: model spend, role time, human review load, accepted
|
||||
artifact count, rejected-output reasons, and lessons written to memory.
|
||||
4. Prove fresh-repo operation on at least one external or semi-external repo
|
||||
without supervisor contamination.
|
||||
5. Keep public proof export clean: no raw worker thoughts, transcripts, private
|
||||
notes, repo secrets, or operator context in public/operator-safe artifacts.
|
||||
6. Preserve the political invariant: capital expands capacity; it does not
|
||||
become command authority over contributors, housing/support, rewards, or
|
||||
agent governance.
|
||||
|
||||
## Imagination Sub-Agent Contract
|
||||
|
||||
Imagination should turn grand pressure into selectable futures with proof gates.
|
||||
It must not smuggle adoption, governance, capital commitments, or external work
|
||||
authority into a draft.
|
||||
|
||||
Every investor-scale Objective Draft should answer:
|
||||
|
||||
- What Bifrost topic, work item, dispatch, receipt, credit, or ledger surface
|
||||
will own the governed work?
|
||||
- What bounded Epiphany execution proves the loop on a fresh or semi-external
|
||||
repo?
|
||||
- What maintainer or human review accepts or rejects the artifact?
|
||||
- What public/operator-safe evidence can be shown without exporting private
|
||||
worker, operator, or agent context?
|
||||
- What compute/model spend, human review load, accepted artifact count, and
|
||||
lessons-added metrics will be recorded?
|
||||
- What consent, legal, security, and public/private export gates must clear
|
||||
before the path scales?
|
||||
|
||||
## Roadmap Shape
|
||||
|
||||
1. Fresh-repo Epiphany proof: demonstrate Face entry, Bifrost-linked scope,
|
||||
bounded role routing, artifact production, review, receipts, and sealed
|
||||
operator-safe evidence.
|
||||
2. Bifrost-first private alpha: all external swarm work exists as Bifrost
|
||||
topics/work items/dispatches/receipts/credit before Discord, VoidBot, Face,
|
||||
or scripts can mirror it.
|
||||
3. Public proof sprint: selected consented tasks record scope, roles, model
|
||||
spend, review load, artifacts, outcome, memory lessons, and case-study
|
||||
permission.
|
||||
4. Design partners: prove the loop on external organizations without requiring
|
||||
them to adopt GameCult mythology or tolerate private-context leakage.
|
||||
5. Support and reward pilots: only after legal/policy gates, portable records,
|
||||
exit rights, and anti-capture controls exist.
|
||||
|
||||
## Forbidden Drift
|
||||
|
||||
- No Discord, VoidBot, repo Face, or script becomes durable governance.
|
||||
- No objective draft treats angel money as permission to bypass review.
|
||||
- No public artifact exports raw worker thoughts, transcripts, private notes,
|
||||
secrets, or operator context.
|
||||
- No rewards, revenue share, housing, benefits, or support program launches
|
||||
without counsel-reviewed gates.
|
||||
- No plan calls itself world-scale unless it names the small proof loop that can
|
||||
be run, reviewed, and measured first.
|
||||
|
|
@ -36,6 +36,7 @@ remembers doctrine; the branch remembers the blade.
|
|||
- The repo now has a one-command local operator path: `.\tools\epiphany_local_run.ps1`. Default mode is `smoke`; it builds the retained Codex app-server compatibility edge, builds native Epiphany operator binaries, runs the coordinator smoke, and writes launcher artifacts under `.epiphany-run/` plus coordinator artifacts under `.epiphany-dogfood/`. `-Mode status` is now Epiphany-native: it builds only Epiphany operator binaries, reads `state/thread-state.msgpack` when present, derives status through `epiphany-core`, and does not start or require `codex-app-server`. Use `-Mode plan` or `-Mode run -MaxSteps 4` for the raw bridge-equipped coordinator entrypoints; use `-Mode mvp -FaceInput "<operator request>" -MaxSteps 4` for the local product cycle that projects Face's character turn, writes a Face/Aquarium bubble, bootstraps a minimal local checkpoint for fresh threads, runs the coordinator with auto-tools, then runs heartbeat sleep/dream maintenance. Live plan/run/mvp modes use the workspace `state/runtime-spine.msgpack`, because CodexThread launch writes worker requests there; the run bundle remains artifact evidence, not runtime lifecycle authority. Add `-ThreadId <id>` and `-Workspace <path>` to inspect or continue an existing thread. `status`, `plan`, and `smoke` do not spend model calls; `run` and `mvp` build and use `epiphany-openai-runtime`. Coordinator workers now launch detached and are polled through runtime-spine instead of blocking the coordinator. MVP runs are non-ephemeral by default so `-ThreadId <id>` can resume and poll later. `-MaxRuntimeSeconds <n>` is passed into worker runtime; timeout writes a failed worker receipt and exits. Failed modeling now blocks downstream verification until the failed result is reviewed.
|
||||
- Current Mom-ready status: the normal MVP pass reaches Face -> coordinator -> detached runtime -> heartbeat sleep, and modeling workers now complete through the ChatGPT subscription transport. The first failure was a stack of violated observability/runtime invariants: worker prompts prepended the whole shared persistent-memory rite, Responses frame liveness was invisible until completion, and the runtime tried to persist hundreds of text deltas before completing the worker job. Role/reorient workers now get a compact Epiphany worker boundary instead of full persistent memory; runtime-spine records sampled raw Responses frame kinds with small previews; contiguous reasoning/text deltas compact before durable storage; and live proofs completed `2fe38dcd-d99e-4c73-9a58-afcc81f851c7`, `241e3851-e3ea-4877-a63b-0d2bbd96a7e2`, and `85149a26-6975-403f-ac93-092b717c5825` instead of timing out. The second failure was stale lifecycle authority: completed runtime jobs remained as unresolved `runtime_links`, replacement launches treated historical active links as current, and one bad validation path opened an orphan job before rejecting the state patch. Latest-link-wins is now the runtime-link invariant, terminal links project completed jobs, stale active history cannot veto replacement, launch validation happens before opening runtime jobs, and completed-but-unreviewable modeling findings stop for review instead of relaunching the same lane. The Eyes/source-gather fork is now landed: Research is a fixed Eyes lane with launch/result/accept/status/coordinator/protocol support, and `regather-needed` modeling findings route to `LaunchResearch` instead of relaunching blind Proprioception. Research statePatch admission is Eyes-shaped only: observations, evidence, scratch, and optional investigationCheckpoint; no graph, planning, objective, or checkpoint authority. Mind admission now leaves typed runtime-spine proof: role/reorient acceptance persists `epiphany.mind.gateway_review` before state admission and `epiphany.mind.state_commit_receipt` after admission with the resulting durable revision. Launch contracts now split the broad receipt catalogue from effect-specific proof profiles for state admission, evidence promotion, repo action, verification, and continuity recovery. Research evidence promotion enforces Substrate Gate read/snapshot grant, Eyes evidence packet, and Mind review before state admission; Verification acceptance enforces Soul verdict and Mind review; Reorient acceptance enforces Continuity recovery receipt and Mind review. The next concrete rebuild layer is Hands action proof once action lanes become live, or collapsing Mind review/state mutation/commit into one state-admission primitive.
|
||||
- The investment dossier readiness target is now explicit: `E:\Projects\gamecult-site\docs\gamecult_integrated_dossier.tex` expects Epiphany to be part of a Bifrost-first labor loop, not only a local Mom demo. The external proof bar is: Bifrost owns topics/work items/dispatch packets/receipts/credit/reward pressure; Epiphany executes bounded work; maintainers review artifacts; public/operator evidence records scope, consent, roles, model spend, review load, artifacts, accepted/rejected outcome, memory lessons, and case-study permission; and private worker/operator/agent context stays sealed. Diligence also asks for a live fresh-repo Epiphany demo, Bifrost work item/topic/agent transport/receipt/ledger demo, CultMesh status, VoidBot/Discord swarm demo, compute/output metrics, and security model for secrets/write permissions/public-private exports.
|
||||
- This Codex operator's own roadmap/todo posture has been retuned for this scale target, with the Epiphany Imagination specialist as an optional sub-agent rail rather than the whole point. `notes/epiphany-investor-readiness-roadmap.md` now says: make the local Mom MVP a repeatable proof bundle; build the Bifrost-first external-work bridge; add compute/review/accepted-artifact accounting; prove fresh-repo operation without supervisor contamination; keep public/operator-safe exports sealed; and treat angel capital as fuel for capacity, not command authority. The Imagination specialist prompt was also updated so investor-scale Objective Drafts must name Bifrost provenance, bounded Epiphany proof, maintainer review, receipts/ledger evidence, compute/output metrics, public/private export safety, consent, and legal/security gates.
|
||||
- Local operator runs now write typed CultMesh intent/receipt documents to `.epiphany-run/cultmesh/operator-runs.ccmp` through `epiphany-operator-run`. The wrapper writes intent before acting and a completion receipt after success; this is the local consent/trace rail, not a hidden scheduler queue.
|
||||
- Status-mode local runs now also write a native CultMesh operator snapshot to `.epiphany-run/cultmesh/operator-snapshots.ccmp` through `epiphany-operator-snapshot`. That snapshot distills the operator-safe MVP status artifact into typed fields such as thread id, state status, coordinator action, CRRC action, reorient action, available actions, and artifact refs; it does not preserve the raw JSON status blob as internal state.
|
||||
- `epiphany-mvp-status --source native` is the current provider-neutral status boundary. It projects scene, pressure, jobs, roles, planning, reorient, CRRC, coordinator status, and runtime-linked worker lifecycle from native core surfaces. It reads runtime-spine job/result receipts for linked jobs so failed workers show as failed in role results, jobs, roles, and coordinator source signals, while successful semantic findings still require typed role/reorient worker result documents. Keep future pluggable model-provider work behind launch/result/runtime documents; do not let provider choice leak into status, prompt authority, scheduler policy, or durable `EpiphanyThreadState`.
|
||||
|
|
|
|||
Binary file not shown.
|
|
@ -77,6 +77,7 @@ active_subgoals:
|
|||
- Organ state now has a hard profile split: resident Epiphany sub-agents use lean `work_organ` state, public/person-shaped agents use portable `persona` state, and heartbeat/swarm machinery owns scheduling/coordination physiology. Face is the Epiphany organ; Persona is the shared GameCult contract for Epiphany Face, VoidBot repo Faces, and Ghostlight characters. Persona documents carry provenance, required public presentation metadata, `date-time` timestamps, typed `candidateActions`, strict anchored thoughts with non-authoritative extensions, custom enum companion labels, and typed affect subrecords for bonds/status reads/doctrine stances. Work organs must not inherit Persona affect/social-bond/status-read machinery just because the old Ghostlight-derived shape had room for it.
|
||||
- The Eyes/source-gathering fork exposed by the Mom-ready MVP proof is now landed as a fixed Research lane owned by Eyes. The quarantined Codex MCP spine may execute typed tool intents and emit typed receipts; the model runtime can build and run provider-neutral follow-up turns from those receipts; coordinator run mode passes the quarantined tool adapter into worker runtime with auto-tools enabled by default; worker runtime now enforces max-runtime with one timeout close primitive for both tokio timeout and watchdog paths; inner `openai-worker-*` jobs are opened before async auth/stream waits and sealed with their outer worker on timeout; native status/roles/jobs/coordinator surfaces project failed and completed runtime-linked jobs as terminal without Codex prompt or scheduler authority; direct tiny model-turn transport succeeds; worker requests record request metrics, transport readiness, and sampled raw Responses frame kinds; worker prompts no longer prepend the full shared persistent-memory rite; stream deltas compact before durable storage; live MVP modeling workers complete instead of timing out; stale completed runtime links no longer block replacement launches; jobLaunch validates before opening runtime jobs; completed-but-unreviewable modeling findings now stop for review instead of relaunching the same blind lane; and completed unreviewable modeling findings with verdict `regather-needed` route to `LaunchResearch` instead of relaunching Proprioception. Research findings are accepted only when their statePatch is Eyes-shaped: observations, evidence, scratch, and optional investigationCheckpoint, with no graph/planning/objective authority.
|
||||
- The GameCult integrated investment dossier at `E:\Projects\gamecult-site\docs\gamecult_integrated_dossier.tex` raises the Mom-ready bar from local demo to diligence-ready loop. Epiphany must be ready to prove Bifrost-first external work: a human/agent work item or topic originates in Bifrost, Epiphany decomposes and executes through bounded roles, maintainers review artifacts, Bifrost records receipts/credit, and operator-safe public evidence can be shown without exporting private worker/operator/agent context. The concrete readiness asks are fresh-repo Epiphany demo, Bifrost work item/topic/agent transport/receipt/ledger demo, compute spend and accepted-artifact metrics, and a security model for secrets, write permissions, and public/private exports. Discord, VoidBot, repo Faces, and ad hoc scripts must not become shadow governance or reward authorities.
|
||||
- Use `notes/epiphany-investor-readiness-roadmap.md` as this Codex operator's investor-scale todo rail and as the optional Epiphany Imagination sub-agent planning rail. Angel capital is fuel for compute, review capacity, legal diligence, infrastructure, and public proof, not a governance throne. The operator roadmap is now: make the local Mom MVP a repeatable proof bundle; build the Bifrost-first external-work bridge; add model-spend/review-load/accepted-artifact accounting; prove fresh-repo operation without supervisor contamination; and keep public/operator-safe exports sealed against private worker/operator/agent context. Imagination should translate world-scale Colossus pressure into Bifrost-first Objective Drafts with consent, maintainer review, receipts/ledger evidence, compute/output metrics, public/private export safety, and bounded proof artifacts.
|
||||
- The May 2026 teardown/rebuild migration is archived under `notes/archive/epiphany-ideal-architecture-rebuild-plan.md` unless a concrete regression reopens it. Preserve the new foundation: Epiphany view/coordinator policy lives in `epiphany-core`, runtime-spine owns job/result lifecycle identity through `runtime_links`, duplicate acceptance is receipt-keyed, public findings stay typed/sealed, view expansion requires a core contract, and app-server remains routing/adaptation rather than a second policy throne.
|
||||
- Treat Phase 5 update/distill/propose/promote/read/notification as complete enough unless a concrete regression appears.
|
||||
- Preserve read-only boundaries for retrieve, distill, propose, freshness, context, graphQuery, roleResult, reorientResult, and the canonical view lenses for scene, jobs, roles, planning, pressure, reorient, crrc, and coordinator.
|
||||
|
|
|
|||
Reference in a new issue