Plan Rider and Unity environment integration
This commit is contained in:
parent
ada2ef2b59
commit
048011708f
5 changed files with 887 additions and 18 deletions
|
|
@ -251,6 +251,11 @@ batch/quit/projectPath command wrapper, and writes inspection/command/log
|
|||
artifacts. On this machine Aetheria is correctly blocked: only Unity
|
||||
`6000.4.2f1` is installed.
|
||||
|
||||
The detailed environment plan now lives in
|
||||
`notes/epiphany-rider-unity-integration-plan.md`. Its opinionated cut is Rider
|
||||
as the IDE/source-context organ, Unity as the editor/runtime fact organ, and
|
||||
Epiphany as the durable coordinator/Self.
|
||||
|
||||
## Phase 6 Direction
|
||||
|
||||
Phase 6 should grow observable harness state outward from the typed spine.
|
||||
|
|
@ -258,9 +263,10 @@ Phase 6 should grow observable harness state outward from the typed spine.
|
|||
Useful candidates:
|
||||
|
||||
1. Dogfood the first Unity editor/runtime bridge in the implementation lane. The bridge can inspect pins, refuse wrong/missing editors, and run exact-editor batch/probe commands; it still needs real Aetheria use before richer engine probes are justified.
|
||||
2. Keep dogfood execution agent-run and auditable through the fixed-lane coordinator and GUI/operator view over the same status/artifact surfaces.
|
||||
3. Keep accepted worker findings review-gated; do not convert acceptance into automatic promotion of arbitrary worker output.
|
||||
4. Keep pre-compaction intervention narrow: steer once at `shouldPrepareCompaction`, latch the compact handoff only after successful steering, then let explicit checkpointing, compact/resume/reorient, and review gates do their jobs.
|
||||
2. Build the Rider+Unity environment plan in slices: named Unity bridge operations, Aetheria-side Unity editor package probes, GUI Environment panel, Rider context bridge, then Rider plugin MVP.
|
||||
3. Keep dogfood execution agent-run and auditable through the fixed-lane coordinator and GUI/operator view over the same status/artifact surfaces.
|
||||
4. Keep accepted worker findings review-gated; do not convert acceptance into automatic promotion of arbitrary worker output.
|
||||
5. Keep pre-compaction intervention narrow: steer once at `shouldPrepareCompaction`, latch the compact handoff only after successful steering, then let explicit checkpointing, compact/resume/reorient, and review gates do their jobs.
|
||||
|
||||
Do not spend Phase 6 polishing Phase 5 out of anxiety. The Phase 5 smoke harness
|
||||
is a regression guardrail, not a ritual drum circle for summoning more tiny
|
||||
|
|
|
|||
Reference in a new issue